Laserfiche WebLink
pARTMENT <br /> ENTAL HEAL <br /> Tg DE <br /> ON LINTY Unit Sup <br /> ervisors <br /> ENVIR SAN JDAQVIN CO Carl Borgman,R.E.H.S. <br /> venue, <br /> Third Floor Mike Huggins,R.E• <br /> Weber A Wilson,R.E.H.S <br /> c E.H. 2708 Douglas W• <br /> 2�qy� Donna K.Heran,R. s 304 East 5202- R.E.H•S- <br /> California 9 Margaret Lagorio, <br /> Director StoClCtOri, _3420 <br /> N Al Olsen,R.E.H•s• Telephone: (209) 468 Robert McClellon,R.E.H. <br /> Program Manager 209) 464-0138 Mark Barcellos,R.E.H.S. <br /> • c4i'9 <br /> ��c• Laurie A.Cotulla,R.E•H.S• Fax: <br /> i F o a <br /> Program Manager <br /> DAVID ATWATER <br /> VAN DE POL ENTERPRISES INC <br /> p 0 BOX 1107A 95201 <br /> STOCKTON <br /> RE: Pacific Pride—West Lane <br /> 3230 North West Lane <br /> Stockton,CA 95204 3 2003 <br /> DATED: <br /> WORKPLAN: Work Plan Addendum <br /> PREPARED$y; Advanced GeoEnvmental Inc- <br /> PREPARED <br /> X <br /> APPROVED 0 <br /> DISAPPROVED 0 Submit by <br /> ADDENDUM Health&Safety code(H&S) <br /> ADEQUATE AND NECESSARY ELE�•lENTS OFTHE WORK-PLAN ' � it <br /> Section 25299.37(c)(3)1: petroleum hydrocarbon contamination in the vicinity <br /> robe borings to as the total p acted soil is warranted, <br /> 1. Advance five additional soil p <br /> drocarbon-imp <br /> of soil boring P-3 and to determine whether excavation of by well MW-3, <br /> will be located approximately 30 to 40 feet northwest of monitoring <br /> Soil boring P-g plan)of P3; <br /> west(not east as indicated in the work p ) <br /> MW 3' _ will be located approximately 15 to 25 feet north-northwest of monitoring 2,northeast <br /> • Soil boring B 9 well M <br /> roximately 30 to 40 feet west of monitoring <br /> south of P3; well MW-1 <br /> Soil boring P-10 will be located aP an of P3, <br /> (not east as indicated n the work I located appro imately 35 to 45 feet southwest of monitoring W-3 near <br /> Soil boring <br /> P-1 t well M <br /> northwest of P-31 and approximately 25 to 30 feet no <br /> rth`��est of monitoring <br /> Soil boring P-12 well be located <br /> • soil boring P-3• <br /> CONp,�NTS AND CONDITIONS the fieldwork. <br /> ' ent(EHD)at least 72 hours prior to initiating <br /> 1. -Notify the Environmental Health Departin sis for every 15 <br /> 2. Obtain a boring permit from <br /> EHD• ar n to clearly <br /> Of one soil samplecompile data necessary <br /> will be submitted for laboratory <br /> nimum one soil sample Per 15 linear feet to <br /> 3 The work plan states thasu�it more than stem <br /> make a reasonable mass calculation• ound storage tank dispenser system <br /> linear feet.if acted s ry'and to former undergr <br /> delineate imp vicinity between the form les Include at least ' <br /> ter samples in the al es as the soil samples. <br /> t to demonstrate and characterize the vertical and laseral exten o <br /> oundwa for the same an ound <br /> 4 Collect grab g. al well located south o oundwater samplesat 60 to 65 feet below gr <br /> and the municip e the gr <br /> impacted groundwater. in the sand layer encountered in P- <br /> one grab groundwater sample <br />