Laserfiche WebLink
I.V <br /> ALPINE AVENUE <br /> POWER POLE <br /> PUMP ISLAND <br /> *[ND Ing i <br /> I <br /> I <br /> ® TK3-N <br /> =0.0058 <br /> TK2-N <br /> MTBE=3.5 <br /> E=0.81 \ I Piping 1 <br /> X=7.3 � \ \ I NPUMP ISLAND <br /> TKI N \\ \\ \�O\ Piping <br /> 4 I I <br /> \ Gam\ \�s \ —I <br /> \ pdj,\ \ A \ \� _S PPH'mo®90 <br /> \ <br /> 40\ \ r <br /> \•� \ \ TK2-9 <br /> W \ �v®IBS--BO 019 3 <br /> .a TK1-9 <br /> ND <br /> E- Pipping 7 Piping 8 <br /> W TM, ,=80 TPH-d=15 Piping 5 <br /> TPH-d=1.3 <br /> .� X=0.0088 <br /> MTBE=0.019 <br /> BUILDING <br /> PUMP ISLANDS CANOPY PUMP ISLANDS <br /> LEGEND TPNH-d: TOTAL PETROLEUM HYDROCARBONS QUANTED AS DIESEL N <br /> PROPOSED SOIL PROBE BORING LOCATION B ZENTOTAL PETROLEUM HYDROCARBONS QUANTIFIED AS MOTOR OIL <br /> SOIL SAMPLE LOCATION T: TOLUENE SCALE <br /> E: ETHYL BENZENE 0 20 40 <br /> LTK1J UNDERGROUND STORAGE TANK LOCATION Y-' E TERTGRY HUYYL ETHER <br /> ALL UNITS REPORTED IN mg/kg: (MILLIGRAMS PER KILOGRAM) FEET <br /> SITE PLAN ® Advanced <br /> PACIFIC PRIDE GeoEnvironmental, Inc. <br /> or NarLbom allabrolo <br /> 3230 N0RTH WEST LANE PROJECT NO.AGE-NC-97-0300 FILE: 0300/FIG2 FIGURE: <br /> STOCKTON, CALIFORNIA DATE: 30 JULY 1999 DRAWN BY: MAC 2 <br />