My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 2010 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2019 4:52:21 PM
Creation date
8/19/2019 4:16:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2013
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />O Attestation No. P 5901 <br />i <br />' •�� Chuck Dowdy <br />Elite IV Contractor Inc. <br />j, x=102 <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On 10/13/2010 Exp Date: 10/13/2012 <br />Cpmpetlan olthLstiafNng course does notcmatea warranty orgu"ntyby C7PW of your in ta/lafion <br />and/or maMtmanme(namfes, vapor texwjy systwz5'andElR PHA5EIsystemr. 7776&2,ning <br />1 , i nurse does not eliminate the: need to strictly adhere to manufacturer instrmbons and procedures when <br />hsfalling andmaintaining males, vapor renvery systems- and EVR PHA5EISystems- A//non/es, <br />t sapor recovery systems and EVR PHASEI Systema must be installed and maintained in accordance with <br />mana2icturermst'ucftons and procedures Aflesfabon applies ONLYtotested named individual. <br />Q-P VV Attestation No. P 5902 <br />Ken R. Stayton . <br />r VR-102- Elite IV Contractor Inc. <br />Attended Installation Training for EVR Phase I by OPW Inc. <br />On: 10/1.3/2010 <br />Exp Date: 10/13/2012 <br />i Compedon of6is pa/ping mu se does not ceatea; wjiamy orguamntybYOPW ofyourinsto//ation <br />and/ormainfenanreofnaa/es vaPorravverysysfc2s andEYR'PF/AS'EI <br />comsedoes notdimWalefhenewlto.stnct/y adherc:to man systems This b-alnrng <br />rnugand maintaining noa/es, va u �rerjn16'tidnsandprocedures�whe, <br />• vaporrecov pa^recoveysm,,t,5 andEYR PHASEISysterny Allnoa/es . <br />e�3'-sys'�ms anddAvvcLASEISysfens must be rnsfa//edandmamtaincdm accordance with ` <br />_= manufdcturerrnsGucdons andprrreduns A[tesddon applies ONLYfo tested <br />' ' ; nartxd lndiwdua/. <br />i <br />` 'Attestation No. /P 5904 <br />O P W <br />•�'" a m"""" Joseph Alex Bartholui <br />VFt402_ Elite IV Contractor Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />• ti <br />On: 10/13/2010 Exp Date: 10/13/2012 <br />• y ' - at Completion afthis training course does not curate a warranty orguamnty by OPW of your insta//alron <br />!i and/or—ntenanceofnon/es, vaporrecoverysysfensand EWPHASE.systems. 71rlsba,nmg <br />course does not eliminate the need to-sincUy adhere to manufacfurerin &t ,owns and o mcedums when <br />installing and maintaining non/es, vaporn eysystemsand.EWPHASE.Systems Allnon/es, <br />vaporiecoverysyYems and EW PHASE.Sysae must be installed and maintained /n acmniance with <br />} manufac1v—ins41u cnsandprcradures. A-sbfbn apples ONLYto,te#ed..,.Mindtvidual. <br />Q P W Attestation No P 5903 <br />Jacod. Burke <br />y VR-102- <br />Elite IV Contractor Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/13/2010 <br />' Exp Date: 10/13/2012 <br />I .f <br />Carnpetidn of thls-tWM/ng coucs� doesnof nea(e a. warranty orguamnty by <br />vaporOPW of <br />�; and/orma/nlmanre cp'hoa/es rem <br />nurse do,$ note//m/nate fhe:neep'h, �Ysnfens and EVR:P/fgSEI won ' <br />rnsU!/i yad/iere to manN s3'sfems. T-h& bhis Gainingsta/lad <br />rgandma{nfainJng noa/es. vap�o achnerinsricrG'ons andpvocedures when j �� <br />I vapor 'ecov&YsYstPmsandEgR'Pi'iASEIS systems and' EYRPMSEd5Ystems Al/noQle <br />manufa¢ri$rer p�andMarndirrts. Attestation app66nO rto M/fl <br />with <br />I <br />ti <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.