Laserfiche WebLink
10/07/2010 THU 10:20 FAX 2094683433 SJC EHD (4001 <br />June 14, 2010 <br />Randa Farragher <br />Elite IV Contractors <br />2535 Wigwam Drive <br />Stockton, CA 95205 <br />********************* <br />*** FAX TX REPORT *** <br />********************* <br />TRANSMISSION OK <br />JOB NO. 3702 <br />DESTINATION ADDRESS 94616342 <br />PSWD/SUBADDRESS <br />DESTINATION ID Elite IV <br />ST. TIME 10/07 10:19 <br />USAGE T 00'37 <br />PGS. 2 <br />RESULT OK <br />San Joaquin County <br />Environmental Health Department <br />600 East Main Street <br />Stockton, California 95202-3029 <br />Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Re: Waterloo Shell, 4315 Waterloo Road, Stockton, CA <br />DIRECTOR <br />Donna Heran, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />SR0060156 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to upgrade and cold start the monitoring panel on the underground <br />storage tank (UST) system at the above noted address. The permit has been approved with the <br />following conditions: <br />1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Garrett Backus at (209) 468-2986 to arrange the following inspection <br />appointments (a 48-hour notice is required for inspection appointments). Please be <br />aware that inspections for emergency work must be scheduled within five days of permit <br />approval. <br />a. Sensor functionality: Functionality of the monitoring system must be verified to <br />ensure that monitoring has been restored to meet the requirements of Title 23 <br />California Code of Regulations and the Health & Safety Code. A copy of the alarm <br />history shall be printed prior to performing the "cold start" of the Veeder Root system <br />and made available at the time of EHD inspection. <br />b. Leak detector test: Leak detector must be tested to confirm that the device can <br />detect a leak of 3 gallons per hour at 10 psi. <br />Please be aware that the facility cannot operate the UST system prior to the EHD <br />inspection and approval. <br />