My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 2010 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2019 4:52:21 PM
Creation date
8/19/2019 4:16:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2013
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 09 13 01 : 03p Eli+ IV Contactors 12094E '342 p. g <br /> 0 Multi-Sync Installatic n Instructions <br /> µL,1�l, 1.R For Blueline Lairl -e Fittings <br /> -PEE This ldt provides the Multi-Sync Repair for applicat :Ins where the pipe Is coming t ru the <br /> �etwlV�+CxInS`. sump wall straight or at an angle. <br /> WARNING:Prepare all surfaces to be bonded prior to core-eting installation steps below. <br /> MSZ BLL-xx Failure to follow each.step will void warranty&may resp It v premature failure of peneiration fitting. <br /> Page 1 This Kit applies for repairing: III .(;line Large Fittings <br /> General Instructions for: CLEANING:Spray all surfaces to be banded with DBC Cleaner and aIle,v air dry or wipe excess with a clean dry <br /> cloth. Surfaces must be dry before applying bonder. <br /> STEP 1: Remove Old Boot STEP Z: Clean all Repair Components STEP I: 'lace&pry Fit Insert&Sleeve <br /> • Remove clamps Clean all repair components with DBC Place :he split cuff insert over the pipe and test fit to <br /> • Cut away old boot prior to installation ins d cif the existing fitting cuff. <br /> • Clean&sand fitting Pla::e :he split sleeve over the pipe&up to the cuff with <br /> Split Cleaner Split the f'.Port up <br /> r Cuff Sleeve <br /> Insert <br /> F <br /> hi�l'IA' <br /> k, rlr i.11i{tlll{I�i sill <br /> t4 <br /> Eccentric Insert <br /> il,; � �1'` t` + {:. '�•'. � �Imo.. _ �4 �� �� M1�(�v1 <br /> If everything fits cbntlnUe STEPS: Install The Sleeve STEP 6 Install&Bond Eccentric Insert Back Together <br /> • Apply DBB V to outside of cuff. Vi a I:Eccentric Insert around the pipe <br /> with the install. If there is a Position the sleeve with the fill port at the top A.)p r Zip Tite to split area on Eccentric Insert,press <br /> pro b11='.rt1With the-fit& Once you have the sleeve lined up correctly, end together&clamp <br /> function of tl7cse parts, either slide onto cuff <br /> <ii;ljust to rrialcQ'fit If pcssibl <br /> ni` call Hin factor+r(,3tl-,34- <br /> 3a[xtr)I��ir �il!Cf�oil <br /> _ _..s. I <br /> . , <br /> STEP 4: Bond Sleeve&Insert <br /> • Apply Zip Tite to split cuff insert. Use 1 of i,i•,li <br /> , I <br /> the clamps to hold in place while curing. "I'liI <br /> • Apply Zip Tite to the split sleeve and use 2 �• <br /> clamps to hold in place while curing. , <br /> ,I <br /> • Leave these clamps In place for approx 30 <br /> minutes for curing before proceeding to } _ 4LL11 ' Gh171fLh�,; ; 4• N I i,, t <br /> the next step l " <br /> `II <br /> I II <br /> ii I t II .i <br /> d�tl.� <br /> Set the Clamp the around the sleeve&over t1w <br /> cuff and tighten"snugly". <br />
The URL can be used to link to this page
Your browser does not support the video tag.