My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 2010 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2019 4:52:21 PM
Creation date
8/19/2019 4:16:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2013
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />Summarized instructions for re -installing Fiberglass test port on a DoubleWall <br />➢ Drain sump of its monitoring fluid, dispose of. <br />➢ Remove the existing test port from the sump wall without damaging the sump. <br />➢ Un -thread the PVC barb assembly connected to the monitoring tubing, clean the threads of all sealant and set <br />aside. <br />➢ Abrade the area around the hole under the test port approximately 1" outward. <br />➢ Dust off and keep absolutely dry. Vacuum out the interiorof the hole to make sure dust does not accumulate in <br />the interstice. <br />➢ Ensure the sump interstice is vented to open air before bonding. <br />➢ Mix bravo retrofit adhesive and apply approximately 1/8" thick to the flat back surface of the test port. (apply <br />less to the center area) <br />➢ Mate the fitting to the bottom of the UDC centered over the existing hole and press and turn to firmly seat it. <br />➢ Allow it to fully cure_per the_instructions on the adhesive container. . <br />➢ After a full cure, re -thread the barb and tubing assembly using a coating of UL -Thread paste or white Vulkem <br />sealant. <br />➢ Pressure soap test the assembly and sump at a maximum of 4 PSI. <br />➢ If it passes all testing, re -fill with new monitoring fluid via Bravo's Hydra -Vac filling procedure and conduct an <br />ALDP test to verify integrity. <br />reei free to print this out for whoever may need to read it. <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.