My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2017 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 11:07:05 AM
Creation date
8/21/2019 9:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Waterloo Shell <br />8/30/2018 Amendment to SR 0078796 <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />�l <br />Site map enclosed? y��echnician <br />NO [ ] <br />Submit copies of ICC Service and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />STP & Vent Box Transition Sump Repair / New UDC & Dispenser Replacement <br />- Saw cut & breakout concrete @ 87 & 91 STP sumps, remove existing manways / break out concrete @ vent transition sumps <br />Remove all existing STP sump rubber entry fittings - remove vent transition sump existing fittings <br />Install new STP sump Bravo fiberglass split entries: product, vapor, vent lines & electrical -communication test port in 87 STP sump <br />-Install new Bravo split entries for vent box sump (2) & 1 electrical ' Perform required testing <br />Back fill STP sumps & transition sumps, set new water tight manways, pour back concrete <br />Remove 4 existing dispensers, saw cut, breakout concrete at all existing UDC's <br />Remove all UDC unterior piping, conduit & wires, cut back approximately 2' of existing piping to each UDC <br />Install 4 new Western Fiberglass DW UDCs with new Smith Fiberglass entry fittings, 3 flex to be installed at UDC 1 vapor 2 product <br />Plumb smith fiberglass product & vapor piping into 4 UDCs / install new OPW product & vapor shear valves <br />At this time- replace 2 submersible turbine & with new accessories in both STP sump, reinstall LDS <br />Pour concrete at UDC cavities <br />Install 4 new dispensers / install Veeder-Root software for ISD, perform cold start- follow all EHD testing requirements <br />Will triple rinse and dispose of UDCs and fiberglass piping at Forward Landfill 9999 S Austin Rd Manteca Ca, will place triple rinse in barrels on site <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />See attached list for dispensers, UDC & piping <br />STP & vent sump - Bravo F-30SSD-BLR-S-RND & Bravo F-40-SS-D-BLR-S-RND Split retro fittings <br />Bravo Titan composite manway cover 42" <br />FE Petro submersible turbine STPR150-VL2 <br />FFS FF20X24HMXM346 Flex connectors <br />/ � .:zee y <br />OPW product shear valve �•, . ii t <br />OPW vapor shear valve AUG 8 0 J 2018 <br />P10012 Western test port C <br />FWHUNMENTAL HEALTH! <br />DEPARTMENT <br />EH230038 (revised 12-11-15) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.