My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 2:09:56 PM
Creation date
8/21/2019 1:52:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Executive Summary <br /> This site was a former service station. The underground storage tanks and the product dispensing <br /> system were removed in January 1989. Soil contaminated with gasoline range hydrocarbons was <br /> discovered at that time. To expedite the cleanup of this site and to protect the groundwater. <br /> contaminated soil associated with the former gasoline storage/dispensing system will be removed <br /> by excavatinu. <br /> Contaminated soils discovered, will be removed. sampled for disposal and covered with plastic <br /> liner. The soil will then be removed from the site within 3 to 4 weeks, to an acceptable landfill for <br /> disposal. <br /> The excavation will be backfilled to surface shortly after removal of any contaminated soil and the <br /> installation ofair sparging/vapor recovery piping within the excavation. <br /> J. <br /> During excavfitioh the site will be secured from the general public with a six-foot high security <br /> fence. No unauthorized persons will be allowed to enter the site during piping removal and <br /> excavating and until the excavations have been backfilled. During excavation and backfilling. <br /> slight petroleum odors and dust may be generated. The site will be screened with gas detectors and <br /> visually for dust to insure that the general public is not exposed. If dust and odors become a <br /> �'`' nuisance, the excavation procedures will be slowed and a water mist may be used for control. <br />
The URL can be used to link to this page
Your browser does not support the video tag.