Laserfiche WebLink
x; r <br /> W EGE WELL CONSTRUCTION LOG <br /> PROJECT NAME= FIEGAL STATION 603 MONITOR WELL NUMBER_Mw-6 <br /> 6426 PACIFIC AVENUE STOCKTON CA TOP OF CASING ELEVATION—UPL— <br /> PROJECT NUMBER DATE COMPLETED 2-22-89 <br /> WELL TYPE MONITOR WELL(WATER) <br /> REMARKS: 12 BAGS CLEAN 03 MONTEREY SAND, 112 BUCKET BENTONITE PELLETS, 10 <br /> CASING- 35'OF 4-SCH.480 BLANK PVC CASING, i WATER TIGHT SECURED TRAFFIC BOX <br /> TYPICAL MONITORING WELL <br /> WELL CONSTRUCTION <br /> .. ...... 1. Total Depth of hole 65' <br /> 2. Diameter of boring 10" <br /> g, 3. Casing length 65' <br /> 5. 4 <br /> 4. Diameter of casing 41 <br /> 5. Depth to top of screen 35' <br /> g' 6. Length of screen 30' <br /> - _ ...._.. screen interval 35' <br /> 1a. <br /> &Green type machine cat slot <br /> 1. screen size 0.02" <br /> r,. a- <br /> ", 7. Surfacs,ieal a- ' <br /> seal material_concrete <br /> 1 t. s 8. Bacld"ill material.l�5-z�' <br /> seal material neat cement <br /> S. Upper seal <br /> seal material <br /> 10. Lower seal 27'-28' <br /> seal material benlonItp ORI <br /> 2 11. Anvmius 28'-65' <br /> material clean e3 Monterey sand <br /> NOTE: Each well constructed with poly-vinyl chloride(PVC) <br /> casing with threaded bottom caps and threaded top caps. <br /> Also, PVC steam cleaned before constructing each well. <br /> Tra1llc boxes are water tight and locked for security. <br />