Laserfiche WebLink
PERMIT TO OPERATE N-1090-3-1 PROJECT # R 603 <br /> SITE LOCATION 6425 PACIFIC AVENUE STOCKTON CALIFORNIA <br /> SYSTEM DISCRIPTION VAPOR RECOVERY FROM GROUND WATER MONITOR <br /> WELLS MW1 MW2 MW3 MW10 AND UST EXCAVATION <br /> WELL EX <br /> FLOW MEASUREMENTS 1 INCH ORIFICE PLATE IN MANIFOLD LATERALS FOR <br /> MW1 MW2 3 MW10 AND EX. 3 INCH ORIFICE <br /> PLATE IN EXIT OF MANIFOLD <br /> FLOW CONTROL PUMP BYPASS 2 INCH GATE VALVE ON INLET OF <br /> ROTRON PUMP #1 DR505 AND ON EXHAUST OF PUMP <br /> #2 DR606 <br /> BACT 4 110 GALLON CAMERON YAKIMA VAPOR SCRUB UNITS <br /> IN SERIES <br /> FIELD NOTES <br /> DATE SYSTEM OPERATINGYES NO <br /> REASON FOR VISIT ��� /�"��� <br /> LATERAL TIME DIFF VAC�UM TEMP PID 02 LEL CO2 <br /> Mwl 2-4 t,5 <br /> MW 213 __ ccs✓ 70 O F. 5 20 <br /> MW10 15'0 y,c l y <br /> Ex A2 3.5 21 G <br /> TOTAL ��-� f - - )7'8 2G• 7S- 3 <br /> BACT PID METHANE 02 LEL CO2 TEMPERATURE <br /> Al <br /> A2 ll,,•Z <br /> A3 <br /> A4 ► Z <br /> VACUUM- INFLUENCETDfPTH TO GROUND WATER <br /> MW1 MW2 MW3 MW4 <br /> MW5 MW6 MW7 MW8 <br /> MW9 / MW10 . — 1 MW1Z / MW12 / <br /> COMMENTS <br /> / z <br /> SAMPLER INSTRUMENT & CALIBRATION <br /> 1 R602 VES MONITORING SHEET <br />