Laserfiche WebLink
PERMIT TO OPERATE N-1090-3-1 PROJECT # R 603 <br /> SITE LOCATION 6,425 PACIFIC AVENUE, STOCKTON, CALIFORNIA <br /> SYSTEM DISCRIPTION VAPOR RECOVERY FROM GROUND WATER MONITOR <br /> WELLS MW1 MW2 MW3 MW10 AND UST EXCAVATION <br /> WELL EX <br /> FLOW MEASUREMENTS 1 INCH ORIFICE PLATE IN MANIFOLD LATERALS FOR <br /> MW1= MW2/3 , MW10 AND EX 3 _INCH ORIFICE <br /> PLATE IN EXIT OF MANIFOLD <br /> FLOW CONTROL PUMP BYPASS, 2 INCH GATE VALVE, _- ON INLET OF <br /> ROTRON PUMP 1 DR505 AND ON EXHAUST OF PUMP <br /> ##2_ -DR606 <br /> BACT 4 110 GALLON CAMERON YAKIMA VAPOR SCRUB UNITS <br /> IN SERIES <br /> FIELD NOTES <br /> DATE 7- SYSTEM OPERATING YES NO <br /> REASON FOR VISIT C<,n�a <br /> LATERAL TIME DIFF—VACUUM TEMP PID 02 LEL CO2 <br /> MWl S 3 !Z hes. 80 pr f,d <br /> MW 2 13 .wry. l(:�)-&A)i Q, <br /> MW10 jc�a� 2S !Gtjt•,� 4•q <br /> EX 1 Ja l• 1tt0 Mk �O Ally <br /> TOTAL -5'S <br /> BACT ID METHANE 02 LEL CO2 TEMPERATURE <br /> Al 17.0 <br /> A2 3-Y 9T 6 ar <br /> A3 3.5 <br /> A4 <br /> VACUUM INFLUENCE DEPTH TO GROUND WATER <br /> MWI, MW2 MW3 MW4 <br /> MW5 / MW6 -� ,- mw / -_ - MW8 <br /> MW9 / MW10 J MW11 / MW12 / <br /> COMMENTS <br /> SAMPLER �L� INSTRUMENT & CALIBRATION MA ,4f_gr-R <br /> 1 R602 VES MONITORING SHEET <br />