Laserfiche WebLink
PERMIT TO OPERATE N-1090;3-1 PROJECT # R 603 <br /> SITE LOCATION 6425 PACIFIC AVENUE STOCKTON CALIFORNIA <br /> SYSTEM DISCRIPTION VAPOR RECOVERY FROM GROUND WATER MONITOR <br /> WELLS MW1 MW2 M143 M1410 AND UST EXCAVATION <br /> WEL—. L EX <br /> FLOW MEASUREMENTS 1 INCH ORIFICE PLATE IN MANIFOLD LATERALS FOR <br /> I"WI MW2 3 MW10 AND EX. 3 INCH ORIFICE <br /> PLATE IN EXIT OF MANIFOLD <br /> FLOW CONTROL PUMP BYPASS 2 INCH GATE VALVE ON INLET OF <br /> ROTRON PUMP 41 DR505AND ON EXHAUST OF PUMp <br /> f2_ DR606 <br /> BACT 4 110 GALLON CAMERON YAKIMA VAPOR SCRUB UNITS <br /> IN SERIES <br /> FIELD NOTES <br /> DATE 7 f?I IT7 SYSTEM OPERATING YES NO <br /> REASON FOR VISIT 14" <br /> LATERAL TIME DIFF VACUUM TEMP PID 02 LEL CO2 <br /> MWl jr" 11 <br /> MW 2/3AAR <br /> MW10 oco <br /> EX ZVA <br /> TOTAL <br /> BACT PID METHANE p LEL CO2 TEMPERATURE <br /> Al <br /> A2 <br /> A3 •t <br /> ■ <br /> A4 4' z yea <br /> VACU`U`M INFLUENCE DEPTH TO GROUND WATER <br /> MWl / MW2 / NW3 / MW4 / <br /> MW5 z -- MW6 / MW7 / <br /> ._.., MW8 <br /> MW9 z MW10 MW11 MW12 <br /> COMMENTS. <br /> SAMPLER INSTRUMENT & CALIBRATION <br /> 1 R602 VES MONITORING SHEET <br />