Laserfiche WebLink
WEGE WELL CONSTRUCTION LOG <br /> PROJECT NAME . MONITOR WELL NUMBER 0 <br /> TOP OF CASING ELEVATION <br /> PROJECT NUMBER DATE COMPLETED <br /> WELL TYPE <br /> REMARKS: <br /> TYPICAL MONITORING WELL <br /> WELL CONSTRUCTION <br /> 7 ' <br /> 1 Total Depth of hole ' 6r <br /> S 7 2 Diameter of boring <br /> �! s 3 Casing length�_ � <br /> 4 Diameter of casing 2 <br /> 5 Depth to top of screen <br /> s <br /> ------- 6 Length of screen <br /> to <br /> ------------ <br /> screen interval.S,? <br /> screen type <br /> >,v.t <br /> 34 screen size <br /> h c 3 <br /> 7 Surface seal <br /> q seal material <br /> t t 6 , }• fi 8 Backfill <br /> �: seal material <br /> �A, ,'� 9 Upper seal 01 <br /> seal material <br /> 10 Lower seal <br /> 1------------ rte_ x �= 1 seal material <br /> 2 11 Annulus C5- 30 <br /> material "73 Sa <br /> NOTE Each well constructed with poly-vinyl chloride (PVC) <br /> �Sf casing with threaded bottom caps and threaded top caps <br /> Also, PVC steam cleaned before constructing each well <br /> r1 � Traffic boxes are water tight and locked for security <br /> j <br />