Laserfiche WebLink
PERMI^1 TO OPERATE N-1090-3-1 PROJECT # R 603 <br /> SITE LOCATION 6425 PACIFIC AVENUE STOCKTON CALIFORNIA <br /> SYSTEM DISCRIPTION VAPOR RECOVERY FROM GROUND WATER MONITOR <br /> WELLS MW1 MW2 M43 MW10 AND UST EXCAVATION <br /> WELL EX <br /> FLOW MEASUREMENTS 1INCH ORIFICE MW]LOTEAND IN EMANIFO3DINCH LATERALS <br /> ORIFICE FOR <br /> M , MW213 ,PLATE IN EXIT OF MANIFOLD <br /> FLOW CONTROL PUMP BYPASS 2 INCH GATE VALVE ON INLET OF <br /> ROTRON PUMP 41 DR505 , AND ON EXHAUST OF PUMP <br /> #2 DR606 <br /> BACT 4 110 GALLON CAMERON YAKIMA VAPOR SCRUB UNITS <br /> IN SERIES <br /> I / FIELD NOTES <br /> DATE �'f�2'L � 7 SYSTEM OPERATING fE S71 <br /> NO <br /> REASON FOR VISIT 1�lltiC� 61��L <br /> LATERAL TIME DIFF VACUUM TEMP PID 02 LEL CO2 <br /> MW-1 <br /> MW 2/3 Ilk <br /> MW 1 0 <br /> EX_ <br /> TOTAL <br /> BACT PID METHANE 02 LEL CO2 TEMPERATURE <br /> Al <br /> A2 <br /> A3 <br /> A4 VLkC'i7[JM INFLUENCE/DEPTH TO GROUND WATER <br /> MW1 MW2 MW3 MW4 <br /> I <br /> MW5 MW6 MW7 MW8 <br /> MW9 MW10 MW11 M412 <br /> COMMENTS : <br /> : Gvl3 <br /> 7 SAMPLER � �/1'�JGP _-. INSTRUMENT & CALIBRATION <br /> 1 R602 VES MONITORING SHEET <br />