Laserfiche WebLink
PERMIT TO OPERATE N-1090-3-1 PROJECT # R 603 <br /> SITE LOCATION 6425 PACIFIC AVENUE STOCKTON CALIFORNIA <br /> i <br /> SYSTEM DISCRIPTION VAPOR RECOVERY FROM GROUND WATER MONITOR <br /> WELLS M141 MW2 MT-73 , MW10 AND UST EXCAVATION <br /> WELL EX <br /> FLOW MEASUREMENTS 1 INCH ORIFICE PLATE IN MANIFOLD LATERALS FOR <br /> j MW1 MW2 3 MW10 AND EX 3 INCH ORIFICE <br /> PLATE IN EXIT OF MANIFOLD <br /> FLOW CONTROL PUMP BYPASS 2 INCH GATE VALVE ON INLET OF <br /> ROTRON PUMP 41 DR505 AND ON E <br /> 42 DR606 XHAUST OF PUMP <br /> BACT 4 1.10 GALLON CAMERON YAKIMA VAPOR SCRUB UNITS <br /> IN SERIES <br /> FIELD NOTES <br /> DATE 6 �—u SYSTEM OPERATING YES NO <br /> REASON FOR VISIT <br /> LATERAL TIME <br /> �yDIF /�p VACUUM TEMP PID 02 LEL CO2 <br /> MW1 .0�] C.� 2 <br /> MW 2/3 1, 0 j 3 <br /> Mw10 36 <br /> EX <br /> TOTAL <br /> BACT PID METHANE 02 LEL CO2 TEMPERATURE <br /> X <br /> Al 0r6 �/, p <br /> A2 0' a '10 as G.& <br /> A3 1"o — floe 00 <br /> A4 d'V I {� 6v,& <br /> VACUUM INFLUENCE/DF,PTH TO C;RnT7un tra•rA <br /> MWI MW2 MW3 <br /> MW4 <br /> ------------ <br /> MW5 / MW6 MW7 l„ MW8 / <br /> MW9 MW10t�4W11 MW 12 <br /> COMMENTS <br /> SAMPLER INSTRUMENT & CALIBRATION <br /> R602 VES MONITORING SHEET <br />