Laserfiche WebLink
WEGE WELL CONSTRUCTION LOG <br /> PROJECT NAME REGAL STATION 603 MONITOR WELL NUMBER Mw-10 <br /> 6425 PACIFIC AVENUE, STOCKTON, CA TOP OF CASING ELEVATION 10 51' <br /> PROJECT NUMBER DATE COMPLETED _ 313189 <br /> WELL TYPE MONITOR WELL (WATER) <br /> REMARKS: 16 BAGS CLEAN 03 MONTEREY SAND 112 BUCKET BENTONITE PELLETS 7 <br /> BAGS NEAT CEMENT WITH 5% BENTONITE POWDER, 30' of 4" SCH 480 SLOTTED PVC <br /> CASING, 35' of 4" SCH 480 BLANK PVC CASING, 1 WATER TIGHT SECURED TRAFFIC BOX <br /> TYPICAL MONITORING WELL <br /> WELL CONSTRUCTION <br /> 7 <br /> - 1 Total Depth of hole 65' <br /> 2 Diameter of boring 10` <br /> 5 8 3 Casing length 65' <br /> 4 <br /> 4 Diameter of casing 4- <br /> 5 Depthkto top of screen 25' <br /> g------ 6 Length of screen 40' <br /> io <br /> ---10----- screen interval 25'-65- <br /> screen type machine cut slot <br /> - 1 screen size o n2" <br /> 7 Surface seal 0-1 6' <br /> ' seal material concrete <br /> 11 6 8 Backfill material 1 5'-17' <br /> h <br /> seal material neat cement <br /> ' 9 Upper seal <br /> 5 <br /> seal material <br /> 10 Lower seal 17'-18' <br /> seal material bentonite pellets <br /> 2 11 Annulus 18'-65' <br /> material aeam*3_Mgnterey sand <br /> NOTE: Each well constructed with poly-vinyl chloride (PVC) <br /> casing with threaded bottom caps and threaded top caps <br /> Also, PVC steam cleaned before constructing each well <br /> Traffic boxes are water tight and locked for security <br /> • <br /> I <br />