Laserfiche WebLink
WEGE WELL CONSTRUCTION LOG <br /> '0 PROJECT NAME REGAL STATION 603 MONITOR WELL NUMBER MW-7 <br /> 6425 PACIFIC AVENUE STOCKTON, CA TOP OF CASING ELEVATION 9 49' <br /> PROJECT NUMBER DATE COMPLETED 2-24-89 <br /> WELL TYPE MONITOR WELL (WATER) <br /> REMARKS: 12 BAGS CLEAN #3 MONTEREY SAND, 112 BUCKET BENTONITE PELLETS 10 <br /> BAGS NEAT CEMENT WITH 5% BENTONITE POWDER 30' of 4" SCH 480 SLOTTED PVC <br /> CASING, 35' of 4" SCH 480 BLANK CASING, 1 WATER TIGHT SECURED TRAFFIC BOX <br /> TYPICAL MONITORING WELL <br /> L_J __ WELL CONSTRUCTION <br /> 7 -- -------- - 1 p Total Depth of hole 65' <br /> 2 Diameter of boring 10" <br /> 5 8 3 Casing length 65' <br /> 4 <br /> 4 Diameter of casing 4" <br /> 5 ' Depth to top of screen 35' <br /> 5 Length onscreen 30' <br /> --- --------- screen Interval 35'-65' <br /> { screen type machine cut slot <br /> screen size n_n2" <br /> 3 <br /> :<Y 7 Surface seal 0-1 5' <br /> seal material concrete <br /> 11 6 <br /> 8 Backfill material 1 5'-27' <br /> seal material neat cement <br /> 9 Upper seal <br /> seal material <br /> __ 10 Lower seal 27'-28' <br /> ------------ seal material bentonite pellets <br /> 2 11 Annulus 28'-65' <br /> material clean *3 Monterey sand <br /> NOTE: Each well constructed with poly-vinyl chloride (PVC) <br /> casing with threaded bottom caps and threaded top caps <br /> Also, PVC steam cleaned before constructing each well <br /> Traffic boxes are water tight and locked for security <br />