Laserfiche WebLink
SCALE: 1'= 10 <br />s <br />i� <br />REVISIONS I BY <br />KEYNOTES q AO <br />a <br />1. INSTALL A 4'X 4' CONCRETE PAD AND SECURE HEALY C.A.S. TO CONCRETE PAD PER MANUFACTURERS <br />SPECIFICATIONS. <br />2. INSTALL NEW HEALY 9961 CLEAN AIR SEPARATOR NEAR EXISTING VENT RACK AND CONNECT TO <br />EXISTING VENTS PER MANUFACTURERS SPECIFICATIONS. <br />3. INSTALL HEALY VP1000P VACUUM PUMPS WITH MC100 INTERFACE MODULE IN EACH DISPENSER <br />VAPOR RETURN LINE. <br />4. INSTALL HEALY 75B -080-S252 8' HOSES, HEALY 900-EVR-FS NOZZLES, HEALY 75-010-S4F2 12" WHIP <br />HOSES, HEALY8701-VV BREAKAWAYS AT EACH DISPENSER. <br />5. TWO EACH EXISTING 6" DIAMETER BOLLARDS TO REMAIN. <br />» <br />6. ONE EACH EXISTING 4" DIAMETER HOOP LOLLARD TO REMAIN. Z <br />7. EXISTING VENTS AND VENT RISER TO REMAIN. 0 <br />GENERAL NOTES ,►-� <br />A. HEALY INSTALLATION TO BE BY HEALY CERTIFIED TECHNICIANS <br />z <br />B. ALL PIPING INSTALLED TO EXISTING VEN75 AT VENT RACK TO BE GALVANIZED PIPE AND FITTINGS. <br />x <br />C. CONTRACTOR TO PAINT ALL EXPOSED METAL, UNLESS PREFINISHED, IN SUITABLE APPROVED <br />COLORS. <br />D. ALL HEALY EVR PHASE II EQUIPMENT TO BE INSTALLED AND TESTED PER MANUFACTURERS <br />REQUIREMENTS PER CARB EXECUTIVE ORDER VR -202. <br />kn <br />E. CONTRACTOR TO PROVIDE SITE SAFETY WHILE WORK IS IN PROGRESS. PORTABLE FIRE <br />N <br />EXTINGUISHERS SHALL BE PROVIDED AT ALL WORK AREAS. kn <br />H °1 <br />F. WORK AREA SHALL BE EXCLUDED FROM GENERAL PUBLIC AND ADEQUATE TRAFFIC CONTROLS V <br />SHALL BE IN PLACE AND ENFORCED. <br />z <br />G. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND TESTED PER MANUFACTURERS C <br />INSTRUCTIONS, APPLICABLE CODES AND STANDARDS, THE PLANS AND SPECIFICATIONS, <br />AND LOCAL AGENCY REQUIREMENTS. <br />O <br />f� N <br />F�1 <br />SHEET INDEXo <br />A <br />SHEET 1 -SITE PLAN <br />SHEET 2 -GENERAL CONDITIONS <br />SHEET 3-HEALY TANK WITH CALCS d <br />M <br />GAN. ��c "Fe9 Date <br />w1 36 o Scale 45 SHOWN . <br />_ U Z <br />* >- Signature® - <br />Drawn K <br />20 FQF CAL\4� 0? ZZ{J <br />�� Job .. <br />Sheet <br />1 <br />of 3 Shee`s <br />V77 <br />G <br />z <br />o � <br />z <br />O 0 <br />U 0 <br />Z O <br />0 �. <br />KEYNOTES q AO <br />a <br />1. INSTALL A 4'X 4' CONCRETE PAD AND SECURE HEALY C.A.S. TO CONCRETE PAD PER MANUFACTURERS <br />SPECIFICATIONS. <br />2. INSTALL NEW HEALY 9961 CLEAN AIR SEPARATOR NEAR EXISTING VENT RACK AND CONNECT TO <br />EXISTING VENTS PER MANUFACTURERS SPECIFICATIONS. <br />3. INSTALL HEALY VP1000P VACUUM PUMPS WITH MC100 INTERFACE MODULE IN EACH DISPENSER <br />VAPOR RETURN LINE. <br />4. INSTALL HEALY 75B -080-S252 8' HOSES, HEALY 900-EVR-FS NOZZLES, HEALY 75-010-S4F2 12" WHIP <br />HOSES, HEALY8701-VV BREAKAWAYS AT EACH DISPENSER. <br />5. TWO EACH EXISTING 6" DIAMETER BOLLARDS TO REMAIN. <br />» <br />6. ONE EACH EXISTING 4" DIAMETER HOOP LOLLARD TO REMAIN. Z <br />7. EXISTING VENTS AND VENT RISER TO REMAIN. 0 <br />GENERAL NOTES ,►-� <br />A. HEALY INSTALLATION TO BE BY HEALY CERTIFIED TECHNICIANS <br />z <br />B. ALL PIPING INSTALLED TO EXISTING VEN75 AT VENT RACK TO BE GALVANIZED PIPE AND FITTINGS. <br />x <br />C. CONTRACTOR TO PAINT ALL EXPOSED METAL, UNLESS PREFINISHED, IN SUITABLE APPROVED <br />COLORS. <br />D. ALL HEALY EVR PHASE II EQUIPMENT TO BE INSTALLED AND TESTED PER MANUFACTURERS <br />REQUIREMENTS PER CARB EXECUTIVE ORDER VR -202. <br />kn <br />E. CONTRACTOR TO PROVIDE SITE SAFETY WHILE WORK IS IN PROGRESS. PORTABLE FIRE <br />N <br />EXTINGUISHERS SHALL BE PROVIDED AT ALL WORK AREAS. kn <br />H °1 <br />F. WORK AREA SHALL BE EXCLUDED FROM GENERAL PUBLIC AND ADEQUATE TRAFFIC CONTROLS V <br />SHALL BE IN PLACE AND ENFORCED. <br />z <br />G. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND TESTED PER MANUFACTURERS C <br />INSTRUCTIONS, APPLICABLE CODES AND STANDARDS, THE PLANS AND SPECIFICATIONS, <br />AND LOCAL AGENCY REQUIREMENTS. <br />O <br />f� N <br />F�1 <br />SHEET INDEXo <br />A <br />SHEET 1 -SITE PLAN <br />SHEET 2 -GENERAL CONDITIONS <br />SHEET 3-HEALY TANK WITH CALCS d <br />M <br />GAN. ��c "Fe9 Date <br />w1 36 o Scale 45 SHOWN . <br />_ U Z <br />* >- Signature® - <br />Drawn K <br />20 FQF CAL\4� 0? ZZ{J <br />�� Job .. <br />Sheet <br />1 <br />of 3 Shee`s <br />