Laserfiche WebLink
MONITIWING SYSTEM CERTV 3ATION <br />CERTIFICATION /TEST DATE: May 19, 2008 <br />Al. FACILITY A2. OWNER <br />Name Waterloo Shell Name Bill and Cathie Norby <br />Address 4315 E. Waterloo Road, Stockton, CA 95215 Address 2303 Woodlake Circle, Lodi, CA 95242 <br />Phone# 209-369-2252 Phone# 209-931-3674 <br />Contact Bill and Cathie Norby Contact Bill and Cathie Norby <br />F. IN -TANK GAUGING / SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />❑ Yes ❑ No* Was accuracy of system product level readings tested? <br />❑ NO * <br />❑ N/A <br />■ <br />❑ Yes ❑ No* Was accuracy of system water level readings tested? <br />❑ <br />No* <br />❑ Yes ❑ No* Were all probes reinstalled properly? <br />■ <br />Yes <br />❑ Yes ❑ No *Were all items on the equipment manufacturer's maintenance checklist completed? <br />No* <br />Was the testing apparatus properly calibrated? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. COMMENTS <br />na <br />Page 3 of 3 <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />■ Yes <br />❑ NO * <br />❑ N/A <br />■ <br />Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />■ <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />❑ <br />Yes <br />❑ <br />■ <br />No* <br />N/A <br />For mechanical LLDs, does the LLD restrict product flow if It detects a leak? <br />■ <br />Yes <br />❑ <br />❑ <br />No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off If the LLD detects a leak? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />■ Yes <br />❑ No* <br />❑ N/A <br />■ <br />Yes <br />❑ <br />❑ <br />No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system malfunctions <br />or fails a test? <br />• <br />Yes <br />❑ <br />❑ <br />No* <br />N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />■ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. COMMENTS <br />na <br />Page 3 of 3 <br />