My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006468
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006468
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 3:56:46 PM
Creation date
8/21/2019 2:54:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006468
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I <br /> FORMER REGAL STATION 603 EXXON SERVICE STATION <br /> WICKLAND PROPERTIES GROUND WATER TREATMENT <br /> 6425 PACIFIC AVENUE AND DOUGLAS ROAD <br /> STOCKTON, CALIFORNIA 95203 -- <br /> CONTAMINATED GROUND WATER INTERIM SAMPLING SCHEDULE <br /> PERMIT CONDITIONS <br /> COMPONENT MAXIMIUM FREQUENCY SAMPLE SCHEDULE EPA <br /> ALLOWED TYPE METHOD <br /> CONCENTRATION <br /> MGL <br /> TRACE METALS 1 X MONTH 24 HR ROTATING Note a one week notice vtll be given prior to start up <br /> CADMIUM 2 COMPOSITE DAYS 213 1 of the ground water discharge system Start-up nate will <br /> CHROMIUM 5 218 1 be the Permit Effective Date <br /> COPPER 6 220 1 Sampling will begin the day of the start up and proceed <br /> LEAD 2 239 1 either on a twice monthly, once monthly or yearly <br /> NICKEL 5 249 1 schedule, see table to the left <br /> ZINC 7 289 1 The sampling will rotate As an example, samples obtained <br /> during the first month on the 5th, will be obtained <br /> on the 12th curing the second month, etc until the entire <br /> TOTAL PETROLEUM 100 2 X MONTH GRAB ROTATING 8015M month has been coverea by the sampling schecule <br /> HYDROCARBONS DAYS <br />�j TOTAL TOXIC 4 57 1 X YEAR GRAB ROTATING 624/625 <br /> ORGANICS DAYS <br /> VOLATILE 0 25 2 X MONTH GRAB ROTATING 8015 602 <br /> HYDROCARBONS DAYS <br /> BTEX TOTAL WITH 2 X MONTH GRAB ROTATING 602 <br /> TOXIC ORGANICS DAYS <br /> TEMPERATURE 150 F <br /> a <br /> i <br /> PH 5 0 10 0 <br /> LEL 10% CONTINUEOUS GASTECH <br /> WATER DISCHARGE 1200 GPD CONTINUEOUS <br /> REPORTS 15th each month <br /> BOD NIA <br /> TSS NIA <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.