Laserfiche WebLink
WEGE Monitoring Well Construction Lag <br /> PROJECT NUMBER R-603 MONITOR WELL NO 2 <br /> PROJECT NAME Recial 603 TOP OF CASING ELEV A 3lQve mean sea <br /> level <br /> REMARKS 8 bags sand, 8 bags cement, 1 bucket pellets <br /> TYPICAL MONITORING WELL <br /> WELL CONSTRUCTION <br /> 7 <br /> 1 Total depth of boring 65 ' <br />• 2 D i am eter of bor kn a 8 <br /> � S 3 Casing length (13 4 ' <br /> 4 Diameter of casing - 2" - <br /> 5 Depth to top of screen 34 ' <br /> 6 Length of screen 30 ' <br /> 10 screen interval 341 -64 ' <br /> 1 3. machine slot <br /> screen type 0 .02" <br /> screen size <br /> • 7 Surface seal `Mater tight traffic box <br /> seal material concrete <br /> 2 '-28 ' <br /> 8 11 8 Backfill <br /> 1-_ -� 01 — ,� ._ -1 Haat f`PrllP tit <br /> Dack I II I I I I cttCr I cU -- - <br /> 24 '-26.s ' <br /> - <br /> 9 Upper seal <br /> seal material bentonite pellets <br /> _ 10 Lower seal --z4 ' -26.5 ' <br /> seal material µbentonite pellets _ <br /> 2 11 Gravel pack 26-5 ' -64 ' <br /> pack material 03 Clean Monterev Sand <br />