Laserfiche WebLink
rrrrr�r�� PAGE OF? <br /> jf S,YTfER1V(TGE'O-ENGIN�'ERS BORING MW-6 <br /> DATE DRILLED 2/21-22/89 <br /> ' SAMPLE INTERVAL <br /> BORE HOLE LOG V WATER <br /> PROJECT REGAL 0603 GEOLOGIST SURFACE 9 as <br /> Thomas Niven ELEVATION <br /> LOCATION 6425 Pacific Ave, Stockton CA DRILLER TOTAL DEPTH 65 feet <br /> Sill Hopate Jr <br /> DRILLING CONTRACTOR DEPTH TO 501_$3 CASING 4' PVC/65 <br /> Hopate Exploration Drilling Co WATER <br /> REMARKS Hand held PID used to screen roll samples placed n mason ars, PID calibrated to a 50 ppm <br /> Iasotine stasndard Elevations measured from WEGE datum corner of tank pad)and tied <br /> nto elevations from a USGS topographic map <br /> .- 0 F C' <br /> LFL. Z LL Q O <br /> Lu cr) � CORE DESCRPTION = REMARKS <br /> 3 0 <br /> O a- <br /> a- zJ Cl' <br /> O Of <br /> 0 m 0- LD <br /> no odor <br /> Si' Dark grey med-coarse poorly grded <br /> 60 a 4/JAR silty sand <br /> SS 656 Big 5/JAR <br />• <br />