Laserfiche WebLink
R603 SEWER 21 1-11-93 <br /> ever reach the 10o LEL level . The clean treated water is <br /> discharged to the 3 " sewer clean out Montly visual inspections <br /> for leaks on above ground lines, tanks and double contained <br /> system will occur. <br /> UPDATE STATUS REPORT #1 <br /> Interim ground water treatment started December 1, 1992 LTT is <br /> vacuum lifting {purging} monitor wells MW1, MW2 , MW3 , MW8 and <br /> MW10 twice a week. Before the well purging commenced, water <br /> samples were obtained from the "ConVault" tank aerator before <br /> dumping 800 gallons of this treated water to the sewer lateral <br /> A continuous LEL reading of the discharge water was observed and <br /> noted on the following table . All discharge requirements were <br /> met <br /> :Sinycery yours <br /> Geor e L. Converse <br /> PrbDect Manager <br /> cc Mr John Margowski , Wickland Properties <br /> Ms Mary Meays, Public Health San Joaquin Co. <br /> h <br /> page 2 <br />