Laserfiche WebLink
During the initial month of operation, three effluent samples were <br /> obtained during the day and analyzed using the lOS50 chromatograph. <br /> The highest value is used to calculate the VOC poundage per day <br /> produced. Presently, an influent and an effluent sample are <br /> obtained upon arrival to the site Adjustments are then made to the <br /> vapor extraction system: removal of liquids from the condensation <br /> traps, closing the air dilute valve to maximize vapor removal, <br /> without causing the REMOX Unit to shut down due to high temperature <br /> shut off (greater than 15500F) , and closing the pump bypass to <br /> create maximum flow and vacuum from the wells Once, these <br /> ad3ustments have been completed and the system has stabilized, <br /> influent and effluent samples are again obtained, along with samples <br /> from the individual extraction orifices (wells) The site is then <br /> secured until the next visit <br /> s - <br /> page 4 of R603 , 04/29/93 <br /> ...tr..?:,�:',..., a,`; +.a4`F�rc'L.v'..�,.-x3 tirCr: sas Xt'i^ :. M _e4 a.s r'..^+ ",.t. , + , �. i... t v'- . i • u� ... &m.�,,.,^ <br />