Laserfiche WebLink
R603 UPDATE-12 12/22/92 <br /> 3. 3 VAPOR RECOVERY <br /> VAPOR RECOVERY SYSTEM .AND MONITORING <br /> As stated in Update Status Report #5, monitoring wells MW1, MW2, <br /> MW3 , MW10 and the excavation 6 inch (EX-4) have been individually <br /> manifolded to a vapor extraction system with individual valved <br /> orifices for flow control sampling and vacuum and flow <br /> measurements from the individual wells . MW2 and MW3 are <br /> manifolded together with 2 inch tubing teed at the wells, but can <br /> be individually tested by placing a packer below the extraction <br /> tee of the well to seal that well from the vacuum system The <br /> individual wells are fitted with a PVC tee head with an air tight <br /> cap for well access The tee lateral (2 inch) is fitted with a <br /> 1/4 inch pipe to tubing fitting for obtaining vacuum/pressure and <br /> temperature readings . Wells MW2 , and EX-4 are fitted with a pipe <br /> to hose 2 inch fitting placed between the tee and the 2 inch PVC <br /> flex hose that goes from the well to their individual <br /> condensation dropouts The condensate dropouts are attached to <br /> the extraction manifold The 3 inch SCH 40 PVC lateral from MW3 <br /> is also fitted with a 2 inch pipe to hose fatting where it enters <br /> the traffic box near MW2 and is teed to the 2 inch tubing from <br /> MW2 at that point MW1 is fatted with a 2 inch PVC Y to allow <br /> access to the well from the straight leg of the Y and vapor <br /> recovery from the angled leg of the Y. The vacuum recovery <br /> piping then rases 7 feet into the air before a 90 degree elbow <br /> connects 2 inch PVC pipe at a slight incline towards the eastern <br /> fence of the compound, 8 feet above the surface From here the <br /> PVC pipe drops into the condensation dropout for MW1, before the <br /> vacuum extraction manifold MW10 is manifolded to the treatment <br /> compound via SCH 40 PVC pipe underground west towards the store <br /> Once the pipe reaches the store it connects into a condensation <br /> dropout (Approximately 5 gallon capacity) before heading over the <br /> roof of the store with 2 inch galvanized pipe <br /> The condensation dropout is below ground in a concrete lined <br /> traffic box. The condensation collected in this tank is removed <br /> weekly via an air tight valve attached to the top of the air <br /> tight lad of the tank Once the pipe reaches the roof of the <br /> store, it 90 degree elbows into SCH 40 UV protected PVL pipe and <br /> heads across the roof towards the treatment compound There it <br /> 90 degree elbows down the wall into a second condensation dropout <br /> tank before the manifold. <br /> TL LLQ -90-1 "I 4-'- � v-�AnIrl AlI=I u7cIIC1 f"�flT1f ens-- a�ion ranks are <br /> I-11C lllani.L. lu 4&- ii+u.iriuu...� •....��. -- ------ ----- <br /> connected to their own 2 inch PVC riser (36 inch in height) with <br /> an orifice plate and a gate valve at the top of the riser <br /> Vacuum/pressure ports are located on either side of the orifice <br /> plate Each orifice (well) has its own manometer, calibrated to <br /> ICdU millimeters /tYm«LLl, Of wate1vYY1t-1 --e) oil Tht-,p manometers <br /> are connected to the ports for continuous measurement of flow <br /> from a particular well , or in the case of MW2 and MW3 , <br /> combination of wells All the extraction wells are manifolded <br /> together above the gate valve to a 4 inch orifice riser before a <br /> PAGE 5 <br />