My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006569
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006569
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 3:46:17 PM
Creation date
8/21/2019 3:10:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006569
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k <br /> ' 1 <br /> 1 t <br /> R603 UPDATE-15 4/8/93 <br /> 3 . 3 VAPOR RECOVERY <br /> VAPOR RECOVERY SYSTEM AND MONITORING <br /> As stated in Update Status Report ##5, monitoring wells MW1, MW2, <br /> TI <br /> MW3 , MW10 and the excavation 6 inch (EX--4) have been individually <br /> manifolded to a vapor extraction system with individual valved s <br /> orifices for flow control sampling and vacuum and flow <br /> r measurements from the individual wells. MW2 and MW3 are <br /> 1 kmanifolded together with 2 inch tubing teed at the wells, but can <br /> fbe individually tested by placing a packer .below the extraction <br /> tee of the well to seal that well from the vacuum system. The <br /> individual wells are fitted with a PVC tee head with an air tight € I <br /> ` cap for well access . The tee lateral (2 inch) is fitted with a <br /> i 1/4 inch pipe to tubing fitting for obtaining vacuum/pressure and ? <br /> ! temperature readings . Wells MW2, and EX-4 are fitted with a pipe E <br /> r , to hose 2 inch fitting placed between the tee and the 2 inch PVC <br /> 3 flex hose that goes from the well to their individual <br /> s , condensation dropouts . The condensate dropouts are attached to <br /> E , the extraction manifold. The 3 . inch SCH 40 PVC lateral from MW3 <br /> ,lis also fitted with a 2 inch pipe to hose fitting where it enters <br /> the traffic box near MW2 and is teed to the 2 inch tubing from + <br /> MW2 at that point . MW1 is fitted with a 2 inch PVC Y to allow <br /> ' access to the well from the straight leg of the Y and vapor <br /> recovery from the angled leg of the Y. The vacuum recovery E <br /> ' piping then rises 7 feet into the air before a 90 degree elbow <br /> 1 rconnects 2 inch PVC pipe at a slight incline towards the eastern <br /> J I� fence of the compound, 8 feet above the surface . From here the <br /> JPVC pipe drops into the condensation dropout for MW1, before the ' <br /> kvacuum extraction manifold. MW10 is manifolded to the treatment <br /> compound via SCH 40 PVC pipe underground west towards the store. <br /> Once the pipe reaches the store it connects into a condensation <br /> dropout (Approximately 5 gallon capacity) before heading over the <br /> , roof of the store with 2 inch galvanized pipe . <br /> MThe condensation dropout is below ground in a concrete lined § <br /> traffic box. The condensation collected in this tank is removed § <br /> weekly via an air tight valve attached to the top of the air � <br /> ktight lid of the tank. Once the pipe reaches the roof of the <br /> store, it 90 degree elbows into SCH 40 UV protected PVC pipe and <br /> heads across the roof towards the treatment compound. There it } <br /> f90 degree elbows down the wall into a second condensation dropout ;4 <br /> ytank before the manifold. <br /> At' the manifold the individual wells' condensation tanks are <br /> connected to their own 2 inch :PVC riser (36 inch in height) with <br /> an orifice plate and a gate valve at the top of the riser. <br /> Vacuum/pressure ports are located on either side of the orifice <br /> f plate . Each orifice (well) has its own manometer, calibrated to ' <br /> read millimeters (mm) of water with red oil . These manometers <br /> are connected to the ports for continuous measurement of flow <br /> from a particular well, or in the case of MW2 and MW3 . F <br /> f combination of wells . All the extraction wells are manifolded <br /> ' 9 together above the gate valve to a 4 inch orifice riser before a <br /> filter in front of the vacuum pump. After the vapor stream <br /> e PAGE 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.