My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006644
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006644
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 3:40:57 PM
Creation date
8/21/2019 3:16:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006644
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02 2112001 "ED 11 44 Fk1 916 777 4101 A tt DRILLI\G IAC LO002/002 <br /> Cont Uc #C57-7 0904 <br /> Post Office Bax 51 <br /> ove, <br /> Rio Vista, CA 94571 <br /> office (707) 374 fax (707) 374.2375 <br /> DRILLING, INC. <br /> environmental <br /> geotechnical <br /> Se]Cwf C8S <br /> February 21, 2001 Proposal # 01006 <br /> Submitted to George Converse .lob Location Stockton,CiA Douglas& Pacific <br /> Western Geo-Engineers Work Description Drill and conttnuous auger core,2 <br /> 1366 East Beamer Street borings to 145' each Water samples will be taken by hydropunch <br /> Woodland, CA 95776-6003 method at 50',100' and at140'Bongs will be abandoned wdh <br /> cement grout All soil & decon water will be plies In 55 gallon <br /> Office #530-665-5300 drums and felt in a designated area <br /> Fax# 530-662-0273 <br /> ❑ems scription Qty Unit Unit Price Total <br /> !Mobilization/Travel 3 Hrs $16500 $49500 <br /> Drill time BK-81 26 Hrs $16500 $4290,00 <br /> Take Hydropunzh samples 6 Hrs $165.00 $99000 <br /> Hydropunch tips & screens 6 Each $60.00 $36000 <br /> ervice Truck 3 pay $12500 $37500 <br /> Steam Cleaner/Cement Trailer 3 Day $20000 $600'00 <br /> Portland 70 Each $14.00 $98000 <br /> Tremie pipe 145 Feet $100 $14500 <br /> Drums 18 trach $4000 $72000 <br /> I <br /> Total Cast Estimate ww $8955.00 <br /> Your firm will be responsible for <br /> 1}Obtaining any site specific permits <br /> 2)Locating and clearly marking any underground installations or utilities <br /> 3)Obtaining access to the sde for a truck mounted drill ng without overhead wire interference <br /> V& W Drilling, Inc shall not be held responsible for any damages to underground improvements not clearly and accurately <br /> marked If bedrock, cobbles,flowing sands,or other adverse dulling conditions are encountered, dnifing will be continued on <br /> a time and materials basis or terminated at the discretion of V& W Dnlling, Inc <br /> aincerely, atI <br /> Craig l Chaff it <br />
The URL can be used to link to this page
Your browser does not support the video tag.