Laserfiche WebLink
UST SYSTEM PRINTSET INFORKATION <br /> 1. Four complete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br /> 2. 1 Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location and number of tanks. <br /> 4. Tank cross-sectional diagram included on prints submitted. <br /> 5. Detail of tank,(Jiping syst excavation and cover.) <br /> 6. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subchapter 16, <br /> Article 3, Sec. 2631 (r) 8 26351 <br /> 7. _ Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br /> 8. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)] <br /> 9. Tightness Test (NFPA 30) is required on both primary (10) and secondary (20) containment systems before covering. <br /> [Section 2635 (b) (6) 8 (7)] <br /> 10. Double walled tanks using pressure or vacuum testing to monitor the annular space. [Section 2635 (b) (7)] <br /> 11. NFPA 329 "Precision Test" required upon completion of installation with tank in operating condition. Test results to <br /> be submitted directly to PHS/EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (g)] / <br /> 12. TANK COMPOSITION <br /> TANK # # # # # # <br /> CAPACITY - <br /> MANUFACTURER <br /> COMPOS:TICN <br /> MODEL <br /> PRODUCT <br /> CORROSION PROTECTION <br /> U.L. LISTED <br /> COMPATIBILITY WITH 00% <br /> METHANOL <br /> 13. TAMK(s) T0,8E INSTALLED <br /> A. Steel clad with fiberglass reinforced piasWC. <br /> B. Ho 'day test required immediately be a "setting" tank(s) (35,000 40,000 volts). [Section 2635 (b) (4)] <br /> C. Fibergl (Sections 2635 (3) 2631 (p)] <br /> (1) Striker ate dimensions and materials. <br /> (2) St er plate under all accessible openings. <br /> (3) Installa instructions require an air test and soap bubble test prior to installation. <br /> D. Non-Clad steel tank [Section (b)] <br /> ) _ Cathodic rotection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc. <br /> (2) ppro by a corrosion engineer or N.A.C.E. technician. <br /> (3) Document statin-g-inspection method and frequency (minimum semi-annual inspection requirement). <br /> 4 <br />