Laserfiche WebLink
A & S ENGINEERING INC. <br /> PLANNING • ENGINEERING • CONSTRUCTION MANAGEMENT <br /> 49 QUAIL COURT, STE. 303, WALNUT CREEK, CA. 94596 • PHONE: 510-933-0578 • FAX 510-933-0588 <br /> r e <br /> 1. 1994 <br /> 5) Comment: Is the piping system a pressure system? Please clarify. L. HEALTH <br /> Response: The piping system is a pressure system. PERMI i/SERVICES <br /> 6) Comment: All equipments, including the sensor probes, must be compatible. <br /> submit confirmation and/or verification. <br /> Response: All equipment is compatible. See attached Veeder-Root monitoring <br /> system cut-sheets. <br /> 7) Comment: When the alarm is activated or when the system fails the pump must <br /> be completely shut off. Submit verification. <br /> Response: The Veeder-Root system can be programed to do this if you are <br /> referring to the line sensor and/or sump sensor. <br /> 8) Comment: Provide the sensor probe in the dispenser sump. Submit <br /> specification and brochure to EHD. <br /> Response: Please see attached cut-sheets for dispenser sump sensors. <br /> 9) Comment: The secondary flex hose is allowed under the dispenser as the last <br /> connection only. Submit confirmation. <br /> Response: The secondary flex hose under the dispenser will be the last <br /> connection as requested. <br /> Please process these corrections as soon as possible. I have also enclosed(3)revised prints of <br /> drawing#T-4 equipment list. The main revision was changing the monitoring system to <br /> Veeder-Root. Feel free to call me if you have any questions or comments. It is important that we <br /> obtain this permit as soon as possible, so we would appreciate your cooperation in this matter. <br /> Sincerely ours, <br /> Vince Padi <br /> A&S Engineering <br /> 207 W. ALAMEDA AVE., STE. 202 9 BURBANK, CA 91502•TELEPHONE: 818-842-3644• FAX:818-842-3760 <br />