My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
REMOVAL 1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 4:41:20 PM
Creation date
8/23/2019 3:57:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Air Monitoring, Personnel Monitoring, Environmental Sampling <br />Techniques and Instrumentation <br />The following monitoring will be performed at this site. <br />• A combustible gas indicator (CGI) will be used to <br />monitor the atmosphere at the site for flammable <br />vapors. <br />A Photoionization Detector (PID) or equivalent will be <br />used to determine the appropriate level of protection. <br />• A Photoionization Detector (PID) or equivalent will be <br />used to screen soils for contamination as they are <br />removed from the excavation. <br />Monitoring with the CGI, for flammable vapors, and the PID, to <br />determine levels of protection, will be performed continually and <br />documented in writing. Monitoring with the PID to screen for soil <br />contamination will be performed as needed. When the PID is being <br />used to screen soils, breathing zone measurements will be <br />alternated with soil screening measurements. Breathing zone <br />measurements from the person screening the soils will be used to <br />guide levels of protection for all workers within the exclusion <br />zone. <br />All environmental monitoring and sampling at the sire will be,., <br />performed in accordance with Federal, State, and Local Regulations <br />and accepted standards. Monitoring instruments will be calibrated <br />and maintained in accordance with the manufacturer's instructions. <br />Calibration will be documented in writing. <br />SPILL CONTAINMENT PROGRAM <br />If there is no health threat from containing a spill, the following <br />spill control measures will be implemented immediately: <br />a. Take measures to stop the release. <br />b. Construct a containment barrier using <br />excavated soil to prevent the contaminant from <br />spreading. <br />C. Remove as much of the liquid portion of the <br />substance as possible using a pump truck <br />and/or adsorbent material. <br />d. Place contaminated containment soil into an <br />appropriatd`container for disposal. <br />e. Place all contaminated materials which cannot <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.