My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 1985 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2023 11:49:43 AM
Creation date
8/26/2019 9:14:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2004
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
507
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UJ/ 67l Loin 11 : vita 4441 7 J:3 Lir "tICV Il,t5 <br />Thursday, March 29, 2001 10.03 AM mmEFESiorea.com (109) 941-4559 <br />2. N REVIEW AND OPERATING MRhRT— FEES <br />rout ta4/ 1 to <br />a. <br />New facility plan review fee of $696.00 (8 hour minimum per facility), <br />00.00 facility fee <br />(includes one tank), $125.00 per tank after the first tank, plus $8.00 statsurcharge <br />fee per <br />tank is due at time of plan submittal plus $18.5o per site state surcharge <br />b. <br />New installation of an additional tarok at an existing facility is $696.00 p <br />review fee (8 hour <br />minimum per facility) plus $500.00 facility (includes one tank), $125 pe <br />new tank alter first <br />tank, and $8.00 per new tank state surcharge fee. <br />C. <br />It should be noted that a $696.00 plant review check fee required for sac 1 <br />submittal allows for <br />up to eight (8) hours of staff review andlor inspection time. Additional <br />spent on plan <br />review, meetings, inspections, phone or office r,00sultations will be billo d, <br />to the applicant at,a <br />rate of $87.00 per hour. <br />d. <br />The maximum review time for UST installation plana is 40 worYing da <br />A preliminary <br />review will be conducted by the P14S-EHD within 20 working days of <br />bmitUd date to <br />identify any gross plan deficierKdea. <br />e. <br />If gross deficiencies are Identified, the plans will be returned with a ch <br />ist identifying plan <br />deficiencies. <br />f. <br />To expedite the review of installation plans, time and a half per Dour <br />lime fee may be <br />submitted to have review completed within 10 working days of submit <br />date if staff is <br />available to perform the review. <br />3. PLAN REVI19W GUIDELxNR.9 <br />a. <br />The enclosed plan review sheet is to be completed and submitted with t <br />three sets of <br />drawings to PHS-EHU. <br />b. <br />A copy of the California UST Regulations may be obtained from the C <br />fornia State Water <br />Resources Control Board at (916) 227-4303. <br />C. <br />Pennits and/or plan check approval may also be required by the San J <br />quin Valley Unified <br />Air Pollution Control District, the County/City Huild* Department wE <br />the Fire District in <br />your respective area. <br />d. <br />A minimum of 3 inspections will be eondwtcd on the UST system ins <br />ation. A $87 per <br />hour inspection fee shall be charged for additional inspections or rein <br />on as required. <br />(See required inspections below) <br />e, <br />Applicant/contractor to adhere to the approval plan and any change or i jvlation <br />shall be <br />reported to and approved by FHS-EHD prior to installation. <br />f. The application for installation of underground tanks is only valid for t <br />which it has been issued. A permit may be extended into the next tale <br />sent to P'H$-EHD requesting this extension thirty days prior to the end <br />one time, one year extension may be granted by PHS-EFID upon receil <br />calendar year in <br />ar year if a letter is <br />F the calendar year. A <br />of this letter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.