Laserfiche WebLink
8. a. Describe the method that will be utilized to purge and/or inert the tank(sj <br />b. TanktPiping Hauler: <br />Name ECt= 100%V C 6QTf2'r-1 <br />Address A J city <br />Phone No.( 9 0 9 ) S_& -0 [ <br />Hauler Registration # (if hauled as hazardous) 1,53 <br />C. TanMping Disposal Site: <br />Name E_ G Y <br />Address 13"738 S Lei v -E2 4✓f City J&N ► A- A <br />Phone Not 4Q 9 ) a [ <br />EPA MO of transported to a permitted TSD facility) CA 518 Z � 3 O l3 <br />9. Is the sampling firm an independent third party from the contractor? YESg NO[] <br />9a. Describe, in detail, how the soil and/or water <br />pc R S Rf.J <br />Zip 9 2.335" <br />beneath the tank and piping will be obtained: <br />10. Describe how the excavation will be backfilled with suitable material upon removal: <br />A <br />11. Handling of excavated soil: <br />a) What material will he used to ver the stockpile? <br />b) What will be the final destination of the excavated stockpile? <br />,,-ter,' i I <br />c) Contaminated Soil Hazardous Waste Hauler. <br />Name E C <br />Hauler Registration #_ 1,573 :3 <br />Address—1 V7 -3 1-0 A ✓ f– City 1, ,j i -A,,A Zip g 2 3 3 S" <br />Phone No. <br />EH 23 046 (Revised 08113199) Page 5 <br />