Laserfiche WebLink
BACKFILL EXCAVATION CERTIFICAT' <br />Project Location 43)S S i e c k- To ' <br />OwnerZ�.� Phone No. <br />Contractor S ed�_V i CES Phone No. &,s 9i4q W ' t 730_ License No. 70& <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />_ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12" lifts: <br />A. Pea gravel --smooth, rounded material not more than one-half (112) inch m diameter <br />B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />Name rmt <br />* <br />Title(Print) <br />signature <br />* Shall be the responsible managing employee on the license or authorized agent. <br />