Laserfiche WebLink
66/19/2003 16:35 408971Q'?5 SSS INC PAGE 04 <br /> Monitoring System Certification-Page 3 of 3 <br /> Site Address; 4315 Waterloo Rd. @ Hwy.99 Date of Testing/Servicing: 05121103 <br /> F. In-Tank Gauging I SIR Equipment: 14 Check this box if tank gauging is used only for inventory control, <br /> Ll Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes 0 No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes ❑ No* Were all rank gauging probes visually inspected for darnage and residue buildup? <br /> ❑Yes ❑ No* was accuracy of system product level readings tested! <br /> ❑Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were al(probes reinstalled properly? <br /> ©Yes ❑ No* Were all items on the,equipment manufacturer's maintenance checklist completed'? <br /> *In Section H below,describe how and wltcn these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLD's are not installed- <br /> Complete <br /> nstalled_Com lete the following checklist: <br /> Oq Ycs Q Nu* Fur cKuipirreul sl.ar l-up vi aturual Cquipruatrt cCrtilicadun was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak reate: 0 3 g.p.h.(1.); © 0.1 g.p.h.(2); ❑ 02 g.p_h.(2). <br /> Notes-. 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> 0 Yes 1 0 No* Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> as Yes u No' was the testing apparatus properly calibrated? <br /> M Yes 0 No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? <br /> R N/.A <br /> 01 Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> Q N/A _ <br /> ®Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> Cl N/A or disconnected? <br /> ®Yes ❑ No* For cleCtiouic LLD's,dues the LuzLiztc 2LutulI14Li4411y blzul u.ff if 411y pu>tiuu of aiC rrrurrituring system <br /> ❑ N/A malfunctions or fails a test? <br /> ®Yes ❑ .No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> a Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe bow and when these deficiencies were or will be corrected. <br /> II. Comments: <br />