My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012689
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
3500 - Local Oversight Program
>
PR0544792
>
ARCHIVED REPORTS XR0012689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:09 AM
Creation date
9/3/2019 11:55:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012689
RECORD_ID
PR0544792
PE
3528
FACILITY_ID
FA0004849
FACILITY_NAME
BILLS BAIT & BEACON GAS
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
515 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> f <br /> r `1 <br /> Geological Technics <br /> 2601 River Road <br /> Modesto,CA 95351 <br /> (209)538-7805 <br /> May 16, 1988 <br /> y 4 <br /> William Stewart1,ir 1 v� <br /> 452 W.Lowell <br /> Tracy,CA 95376 1: .IT <br /> -A E-NIVIRC <br /> ��++CCVtc1% . i�I <br /> SubJect: Addendum to Phase 1-Site AssOSsment Proposal <br /> Beacon Station 515 W.Elaienth Street In Tracy California <br /> Dear Mr.Stewart; <br /> In response to San Joaquin Local Health Distrfct's letter dated Ma, 10, 1988,we are addressing <br /> . the follovrIng three points: <br /> i. Monitoring Wells - Three monitoring wells will be installed into the first water <br /> strata to determine Its hydraulic gradient and evaluate groundwater <br /> conteminatton, The proposed location of each monitoring well Is shown on the <br /> enclosed site map. The monitoring wells will be constructed and sampled as <br /> described In the proposed work plan dated March 25, 1988, <br /> 2. Sample Screening - Of the soil samples collected euring&filing,certain <br /> samples will be selected for analysis. The goal of this selective process is to <br /> - reduce the project's cast without compromising its quality, Field observations <br /> noting sediment type(especially grain size and clay content),moisture content. <br /> visible evidenceof contamination Ox.,color change due to reduction of iron or <br /> discoloration from hydrocarbons and other pollutants),and the presence of <br /> contamination odor will be used toseleci samples for analysis. A representativ3 <br /> sample from each IIthe logy will be analyzed. ATso a sample wilt be collected and <br /> analyzed from 10 to 15 feet below the last observable contominatton, Thisshould <br /> insure a zero-contaminatlon sample is collected. <br /> 3. SamploAnalysls - Soft samplesshall be analyzed for both total extractable <br /> hydrocarbons(diesel,kerosene,and motor oft)and total volatile hydrocarbons <br /> (gasollneandaromatlehydrocarbons), Analytical fees for this Comb fned analysis <br /> is$300 per sample of either water or soil. <br />
The URL can be used to link to this page
Your browser does not support the video tag.