My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
950
>
2900 - Site Mitigation Program
>
PR0505733
>
SITE INFORMATION AND CORRESPONDENCE CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
9/3/2019 2:30:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 1
RECORD_ID
PR0505733
PE
2950
FACILITY_ID
FA0006970
FACILITY_NAME
TOSCO #787
STREET_NUMBER
950
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23406002
CURRENT_STATUS
02
SITE_LOCATION
950 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-WGE- � 1386 E. BEAMER STREET <br /> WOODLAND,CA 95695-9603 <br /> WESTERN GEO-ENGINEERS FAX (916)662-0273 <br /> CALIF. CONTRACTOR a 513857 A CORPORATION (916) 662-4541 <br /> REGISTERED GEOLOGISTS <br /> Mr. John Rutherford <br /> DESERT PETROLEUM <br /> P.O. Box 1601 <br /> Oxnard, CA 93032 <br /> (805) 644-6784 <br /> RE: Summary of previous work attributed to Western Geo-Engineers <br /> for DESERT PETROLEUM SERVICE STATION #787, 950 11th Street, Tracy, <br /> CA. <br /> Two reports were submitted concerning the above site: <br /> A. Soil and Ground Water Investigation, dated July 28 , 1988, <br /> study conducted in May and June, 1988 . <br /> Field Investigative Methods <br /> 1 . Collecting soil and water samples from the <br /> excavations; <br /> 2. Drilling three exploratory boreholes (monitor wells <br /> 1 through 3) ; <br /> 3. Converting these boreholes into ground water <br /> monitoring wells; <br /> 4. Collecting ground water samples; <br /> 5. Surveying the well heads; <br /> 6. Collecting ground water gradient data throughout <br /> this assessment period. <br /> B. Ground water monitoring, supplemental report to the Soil <br /> and Ground Water Investigation, dated September 14, <br /> 1988, conducted during the months of July and August, 1988. <br /> Upon request, Western Geo-Engineers proceeded with a ground water <br /> sampling for DESERT PETROLEUM for May, 1990. <br />
The URL can be used to link to this page
Your browser does not support the video tag.