Laserfiche WebLink
WESTERN GEO-ENGINEERS <br /> The following chemical results of the water samples obtained during the . <br /> monitoring round performed June 1 , 1988 (see table 3). All samplEs are <br /> collected after pumping 15 gallons froin the well to be sampled. A <br /> }. dedicated bailer with an adjustable bottom flow valve was then lowered <br /> into the well to sample water from the upper three feet:af the aquifer. <br /> jibe sample was then slowly drained (thru the adjustable flow valve) into <br /> a previously certified clean "EPA protocol" series 200. 1 1 amber glass <br /> bottle with teflon closure "Boston. Round", and 2 series 200 40 cc "VOA" <br /> vials with teflon lined closure with no headspacellabeled.and immediately <br /> cooled to 4°C (ice chest) then delivered with chain o: .custody to <br /> Eureka Laboratory. <br /> it- <br /> M MON <br /> J I <br /> I <br /> e. <br /> s : <br />