Laserfiche WebLink
Page 1 Of 2 eq Ye.rh 1 ridgy YQ'Y P1hl+ <br /> m <br /> p; Sif�S The r"P9 of construction will be lira Ltad between the hours of 7130 A.R. and 4130 P.M., Monday, to Friday. Any requsat for <br /> work beyond the hours Acted herein and any Work on the weekends and holidaysWillInquire prior approval from the City. <br /> The Permittee shall pay for all addition: City InapectioO, beyond the normaL working hours. <br /> City inapertiene shall be performed Monday - FrLday betwaan St00 A.M. and 5.00 P.M. Any Loopectlan performed beyond <br /> f! theme hours, Ln aorordante with Condition 15 of thin pozmit, will be conei,dered overtime and will be paid by the <br /> Permittea in advance to the Public Rorke Department. <br /> IS- Nan-cemplianaa of City Codon, Plana, Speeificatinna And 'conditions of thin permit may result In fines and penalties as <br /> established by the city Council. <br /> 15, permittee @hall Comply With the following special condition¢ <br /> THIS PERMIT ISSUBD PURSUANT TO ALL PROVIarCNS OF CITY OF TRACY PRIOR TO EXCAVATION, CONTRACTOR MUST CONTACT <br /> MUNICIPAL CODE. THIS PERMIT IS GRANTED UPON THE EXPRESS THE FOLLOWING TO HAVE BELOW-GROUND FACILITIES <br /> CONDITION THAT THE PERMITT$e SHALL BE RESpONSrnOE FOR Alt CLAIMS LOCATED (48 NOURS PRIOR To WORM)i <br /> AND LIABILITIES ARISING OUT of WORK PERFORMED UNDER THE PERMIT <br /> DR ARISING OUT OF "RHITTEE'S PAILVRE TO PERFORM THE OBLIOATIONB UHDEROROUHO SERVICE ALERT <br /> N V"M RESPECT TO STREET MAINTENANCE. THE PERMITTEE SHALL, AND SY (806) 2SI-2600 (Toll Free) <br /> M ACCEPTANCE OF THE PERMIT AGREES To, DEFEND, INDEMNIFY, SAVE AHO 40113SARVICB CENTER <br /> 0) HOLD HARRlXS8 THE CITY, ITS OFFICERS AND EMPLOYEES, FROM AND (709) 831-4420 <br /> ACAINST ANY AND ALL SUITSr CLAIMS OR ACTIONS BROUGHT BY ANY PERSON <br /> 10 FOR OR ON ACCOUNT OF ANY BODILY INJURIES, DISEASE OR ILLNESS NOTE1 YOU ARE NOTIFIED THAT SECTION 000 OF <br /> 01 CA VAHACE TC MASONS AND/OR PROPERTY SUSTAINED On ARIatkc IN Tilt THE LABOR CUVE REQUTABS THE ISBUANCB of A <br /> p❑ CONSTRUCTION OF THE WORK PERrORREO UNDER THE PSRNIT OR IN PERMIT BY THE DIVISION OF INDUSTRIAL SAFETY <br /> TNR CONSTRUCTION OF THE MORK PERFORMED UNDER TH8 PERRET OA IN Or THE STATE UP CALIPORNIA PRIOR TO 7148a CONSEQUENCE OR PERMITTEV'S FAILURE TO PERFORM THE OBLIGATIONS WITH CONSTRUCTION OF ANY TREMCN OR BXCAVATIDH <br /> p RESPECT TO STREET MAINT£NANCS. WMICH IS FIVE FEST OR DEEPER ANO INTO WHICH A <br /> W PERSON IS REQU1R86 TO DESCENT. <br /> Z ERMITTEB "BEES ABIDE BY THE PROVISIONS -or THIP PERMIT. <br /> r 9 EXCAVATION IN CITY STREET AREAS WITHOUT AN <br /> EXCAVATION PERMIT MAY BE PUNISHABLE BY A <br /> PSRHI E S SIGNATURE �.✓'^�"""` DATE FIRE. <br /> 2 <br /> x Permittee agreas that they harety accept complete responsibility for naardination With, reporting to, and Complying with the <br /> direnkIOA of, any and all bosrda or diatricta, including but not limited to, inn Joaquin County Local Neaith District and <br /> California RegLanal Water Quality control Eoard, or Any other regulatory agency having jurisdiction or authority over loll or <br /> ground water contamination such as that currently found at the site of this work, including the preeervetlon of the health and <br /> a aftty of Persons Working near or In any trench or excavation or on the aurfaao of the CCAetrUCtLDn project, Or any peredam <br /> passing by or Observing, or any persons living in the vicinity of tri construction project, for any reason Whatsoever that may <br /> Advar@sly, or otherwise affect the health or safety, now and in the future, of "home persona or group of peraana. <br /> bFurthermore, permitteehereby accepts complete rasponelbility for disposal of any petroleum affected voila, or ground water, <br /> 9 Including reporting to and complying with the requirements of any, or aLl, of the ctatsd, or any other, regulatory agencies as <br /> diacumand Above. <br /> N <br /> f <br /> i <br /> a J f <br /> ''h <br />