My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
8203
>
2900 - Site Mitigation Program
>
PR0502410
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
9/3/2019 4:49:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0502410
PE
2960
FACILITY_ID
FA0005437
FACILITY_NAME
UNOCAL BULK PLANT #0788
STREET_NUMBER
8203
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25014003
CURRENT_STATUS
01
SITE_LOCATION
8203 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F"�` I Ci`x le Pt HEALTI) <br /> Unocal Corporation <br /> Diversified Businesses <br /> 2000 Crow Canyon Place,Suite 400 <br /> _ -EP q 1 k� IO; 50 San Ramon,California 94583 <br /> v L Telephone(510)867-0760 <br /> Facsimile(510)277-2309 <br /> UNOCAL© <br /> Northern Region <br /> corporate Environmental September 12 1995 <br /> Remediation and Technology <br /> Ms. Mary Maeys <br /> San Joaquin County Public Health <br /> Environmental Health Division <br /> 304 East Weber Avenue <br /> Stockton, California 95201-0388 <br /> Schedule of Remedial Activities <br /> Former Unocal Bulk Plant 0788 <br /> 8203 East 11th Street <br /> Tracy, California <br /> Dear Ms. Maeys: <br /> This letter serves to notify you of Unocal's revised schedule for remedial activities at the <br /> Unocal site referenced above. A proposed schedule of activities was originally presented <br /> in a letter prepared by Pacific Environmental Group Inc., and dated December 30, 1994. <br /> The revised schedule is requested due to a change in project managers. Ms Penny Silzer. <br /> has resigned from her position and the Tracy site has subsequently been transferred to me. <br /> Design plans for the soil vapor extraction/air sparge remediation system to address <br /> petroleum hydrocarbon-impacted soil and groundwater have been completed. Presently, <br /> Unocal is preparing bid packages for contractor selection for the installation of the <br /> remediation system, and securing capital equipment. <br /> The installation of the soil vapor extraction and air sparge wells is scheduled to be <br /> completed during the week of October 16, 1995. Construction of the remediation system <br /> is anticipated to be completed by December 29, 1995. Based on this revised schedule, <br /> remediation system start-up should occur by February 1, 1996. <br />
The URL can be used to link to this page
Your browser does not support the video tag.