My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
8203
>
2900 - Site Mitigation Program
>
PR0502410
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
9/3/2019 4:49:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0502410
PE
2960
FACILITY_ID
FA0005437
FACILITY_NAME
UNOCAL BULK PLANT #0788
STREET_NUMBER
8203
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25014003
CURRENT_STATUS
01
SITE_LOCATION
8203 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i <br /> Quarterly Summary Report <br /> First Quarter 1995 <br /> Unocal Bulk Plant 0788 V <br /> 8203 East 11th Street 1995 <br /> Tracy, California ENV:'' ^"c,'`IT^L I;EALTH <br /> City/County ID #: Unknown PERlvul/SERVICES- <br /> County: San Joaquin <br /> BACKGROUND <br /> A partially buried 5,000-gallon transmission fluid storage tank was removed on <br /> December 13, 1989, and analysis of soil samples indicated low levels of petroleum <br /> hydrocarbons. The San Joaquin County Public Health Services Department requested <br /> additional investigation on January 30, 1990. Groundwater Monitoring Wells U-1 <br /> through U-3 were installed on October 24 and 25, 1990. Wells U-4 through U-6 and <br /> exploratory soil Borings U-A through U-C were installed in May 1991. On-site <br /> Wells U-7 and U-8 and off-site Wells U-9 and U-10 were installed in March 1992. A <br /> Remedial Action Plan (RAP) was submitted on March 18, 1993. A work plan for <br /> implementation of the RAP was submitted on July 13, 1993. System design was <br /> completed June 18, 1993. Air emissions permit application was approved by the San <br /> Joaquin Air Pollution Control District in July 1993. The bulk plant was permanently <br /> closed and all related activities ceased on December 1, 1993. The aboveground tanks, <br /> loading racks, and garage structure were removed from the site in September 1994. <br /> RECENT QUARTER ACTIVITIES <br /> Quarterly groundwater monitoring and sampling were performed in February 1995. As <br /> stated in a work plan dated December 30, 1994, the preferred remedial alternatives are <br /> soil vapor extraction and air sparging. Designs to implement these remedial strategies <br /> were initiated, and equipment is being specified. Modified air permits will be obtained <br /> pending final equipment specification. Initial utility service contacts were made. <br /> NEXT QUARTER ACTIVITIES <br /> Quarterly groundwater monitoring and sampling will be performed and documented. <br /> Remedial system design will be completed. A work plan describing the installation of <br /> sparge points and soil vapor extraction points will be submitted. Bid packages will be <br /> prepared, and a building contractor will be selected. Appropriate building permits will be <br /> obtained. <br /> CHARACTERIZATION/REMEDIAL STATUS <br /> Soil contamination delineated? Yes. <br /> Dissolved groundwater delineated? No. <br /> Free product delineated? Not applicable. <br /> Amount of groundwater contaminant recovered this quarter? None. <br /> 31000103/1Q95QSR I April 19, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.