Laserfiche WebLink
•y <br /> Brian T. Frus JO <br /> Pacific Environmental Group, Inc. <br /> Project: 310-01.04 <br /> Date: February 1, 1993 <br /> Calculate Mass Removal Over Time: <br /> Cf <br /> M(t) (CO- flow) - I [1 - [100], [I (1 - exp(-kA- t) ) + 1100- tJJ <br /> Graph the mass removal, M over time: <br /> t 0• day,2• day . .360• day t2 := 0• day,30• day . .360- day <br /> t2 M(t2) t2 := 1- day <br /> 1000• lb ------[7 — . <br /> day lb M(t2) <br /> 0 0 = 7.1 <br /> 30 180.451 lb <br /> 60 306.846 <br /> 90 397.577 <br /> 120 464.779 <br /> M(t) 150 516.457 <br /> 180 557.893 <br /> 210 592.573 <br /> 240 622.794 <br /> 270 650.074 <br /> 300 675.414 <br /> 330 699.474 <br /> 0 lb 360 722.689 <br /> 0• day t 360- day <br /> Units and conversions: <br /> gm E 1M day 1T cm E 1L <br /> day 3 <br /> M = 1 1000- cm cf E 28.32. 1 <br /> 1440 <br /> -6 <br /> ug 10 . 9M lb = 453.6- gm <br />