Laserfiche WebLink
August 8, 1994 • • <br /> Page 3 <br /> SCHEDULE <br /> Pursuant to approval of this work plan by the SJCHSD, the test pitting and soil <br /> sampling activities will begin by August 25, 1994. Pilot landfarming activities, if <br /> feasible, will be performed from September through October 1994. Based on the <br /> results of described scope of work a final remedial strategy will be selected. A <br /> brief work plan presenting the site remedial strategy and an implementation <br /> schedule will be submitted to the SJCHSD by December 31, 1994. <br /> If you have any questions, please do not hesitate to call our office. <br /> Sincerely, <br /> Pacific Environmental Group, Inc\��R <br /> u <br /> oseph Izrzio {r CERTII G <br /> • ENGINE'.,,, ; <br /> Project Geologist <br /> CEG 1672 Sr4rE of cP �o <br /> Attachments: Figure 1 - Proposed Soil Boring Location Map <br /> Attachment A- Field and Laboratory Procedures <br /> cc: Ms. Mary Meays, San Joaquin County Public Health Services - <br /> Environmental Health Division <br /> 3100011B/WKPLN <br />