Laserfiche WebLink
t <br /> SITE HEALTH& SAFETY PLAN <br /> 1.0 INTRODUCTION <br /> A. OVERVIEW <br /> This Project Safety Plan delineates the basic safety requirements for the <br /> drilling of a minimum of three groundwater monitoring wells at the <br /> Unocal fuel terminal located at 8203 West lith Street,. between <br /> Macarthur Drive and Cabe Road in Tracy,California. <br /> 1 <br /> The above referenced site is currently an operating Unocal bulk transfer <br /> station.The property is owned by Unocal. <br /> - During the removal of a 5,000 gallon transmission fluid tank from the . <br /> southwest portion of the property on December 13, 1989, samples were <br /> 3 collected for laboratory analysis. Diesel #2, toluene, ethylbenzene, and <br /> xylenes were detected at maximum concentrations of 24,.0.15, 4.9, and <br /> 12 parts per million (ppm), respectively. Based on these analytical <br /> results, the San Joaquin County Department of Health Services issued a <br /> letter dated January 30, 1989 requesting further investigation. <br /> The provisions set forth in this plan will apply as minimum guidelines to <br /> be followed by the employees of Pacific Environmental Group, Inca and <br /> their subcontractors working on this phase of the project. The subcon- <br /> tractors may elect to modify these provisions, but only to upgrade or <br /> increase the safety requirements, and only with the concurrence of Pacific <br /> Environmental Group,Inc.as designated and accepted in writing. <br /> 2.0 PROJECT SAFETY,AUTHORITY <br /> A. ON-SITE PROJECT SAFETY <br /> Personnel responsible for the project safety are: <br /> i <br /> 3100101/SSP.00W 1 October 17,1990 <br />