My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012752
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
8203
>
2900 - Site Mitigation Program
>
PR0502410
>
ARCHIVED REPORTS XR0012752
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:10 AM
Creation date
9/4/2019 9:08:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012752
RECORD_ID
PR0502410
PE
2960
FACILITY_ID
FA0005437
FACILITY_NAME
UNOCAL BULK PLANT #0788
STREET_NUMBER
8203
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25014003
CURRENT_STATUS
01
SITE_LOCATION
8203 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' _ <br /> 21 <br /> One potentially hazardous situation that may occur during this investigation is <br /> the delivery of fuel to the station. All operations related to this investigation <br /> shall be modified or temporarily suspended if they will impede the safe off. <br /> Ioading of fuel. The Project Safety Officer will make this determination in coop- <br /> eration with the delivery truck operator. Whenever possible, the Project Safety <br /> Officer will ascertain the date and time of delivery, and the potential for <br /> conflicts with site operations before work begins, <br /> 4.0 RISK ASSESSMENT SUMMARY <br /> It is not anticipated that there will be any significant or majorotential s <br /> exposures source <br /> of <br /> exp es due to the scope of work to be followed on this project. The potential <br /> of any increased risk of exposure on other workers or the surrounding comma- <br /> mtY is minimal. The potential exposurewould probably originate from airborne <br /> dusts containing low level concentrations of VOCs. <br /> Due to this potential, the Contractor will have equipment on-site to provide for <br /> dust control during drilling activities,if it appears that dust control is warranted. <br /> Also, perimeter air monitoring, to detect potentially migrating contaminants, 4 <br /> F may be conducted to ensure no hazardous materials are migrating to the <br /> 1 <br /> surrounding community. <br /> 5.0 E"OSURE IVIONI1 ORING PLAN <br /> A GENERAL <br /> An air quality monitoring program shall be implemented to provide <br /> baseline and on-going air quality data for site operations. The program <br /> shall include: <br /> A preliminary survey of existing air quality conditions, <br /> prior to any surface disturbances and, if possible, <br /> under anticipated "worst case"weather conditions; to <br /> be used to establish baseline levels for input into the <br /> respiratory protection selection process; <br /> 2• An on-going evaluation of on-site atmospheric <br /> contaminant concentrations during site remediation <br /> activities that involve significant surface disturbances; <br /> 3. Perimeter monitoring of downwind air quality condi- - <br /> tions during significant surface disturbances. <br /> 3100101/ssp.00W 5 <br /> October 17,1990 <br />
The URL can be used to link to this page
Your browser does not support the video tag.