Laserfiche WebLink
2. Personnel Exposure Monitoring Records (spiral or <br /> bound permanent log books will be used) <br /> 3. OSHA 200-Current to within 5 days <br /> 4. Accident reports consistent with the established - - <br /> Pacific Environmental Group,Inc.procedures <br /> B. MEDICAL RECORDS <br /> Permanent medical records shall be maintained in confidential files by <br /> the contract physician/ medical clinic. The physician will supply Pacific <br /> Environmental Group, Inc, with a medical status document, certifying <br /> that the personnel assigned to the project are physically capable of <br /> performing their individual work tasks. <br /> r 15.4 SIGNATURES <br /> Site Health&Safety Plan Approved By: <br /> Signature: Date: <br /> Name: <br /> Title: Project Manager, <br /> Pacific Environmental Group,Inc. <br /> Contractor and Sub-Contractor Agreements: <br /> 1. Contractor certifies that the following personnel to be <br /> employed on the subject project have met the follow- <br /> ing requirements of the OSHA Hazardous Waste <br /> Operator Standard (29 CFR 1910.120) and other <br /> applicable OSHA standards. <br /> 2. Contractor certifies that in addition to meeting <br /> - OSHA requirements, it has received a copy of this <br /> Site Health & Safety Plan and will ensure that its <br /> employees are informed and will comply with both <br /> OSHA. requirements and the guidelines in this Site <br /> Health&Safety Plan. <br /> ,_ --_--3___.-ContFactor further certifies--that it has-Bread-and- --.----- ...: <br /> understands and will comply with all provisions of this. <br /> 3100101/SSP.00W 18 October 17,1990 <br />