Laserfiche WebLink
N <br /> _ SCOPE OF WORX <br /> Work performed by P <br /> Proximity <br /> AC RC included a water supply <br /> ty of the site to groundwater su ! PP Y well survey to determine the <br /> conducting field activitiesinstallation <br /> PP Y wells, a literature and ma <br /> outlined in PACIFICs workian dated llat on f three P search prior to <br /> sgroundwater monitoring wells as <br /> On October 24 Y ' 199Q. <br /> through and 25' 1990' PACIFIC installed groundwater Monitoring$ U 3 at the locations shown on Figure 2. <br /> diameter PVC;casingThe wells were constructed with Xin6h. <br /> samples were collected as 5-foot screened <br /> ed from <br /> 7 to 27 feet <br /> below ground Surface. Soil <br /> submitted for analysis b als during drilling, and selected samples were <br /> insta[Ied Y aState-certified analytical laborato <br /> as described in the invests ative ry' The wells were <br /> (Appendix A) All site wells were develo`ed Procedures section of <br /> accordance this report <br /> Oped and saIIipled on November 11 <br /> l with the procedures outfiried in A <br /> measurements were recorded for hydrologic calculations.ons pj7e 1990`in <br /> At this time, depth to water <br /> location and elevation by a State-registered surveyor. wells were surveyed for <br /> 31OWOVREPORT <br /> 3 <br /> Fcbruary 13,1991 <br />