Laserfiche WebLink
G E ► !ER - RYAINC . WELL SAMPLING <br /> General and Environmental Contractors FIELD DATA SHEET <br /> COMPANY b-+ 65 JOB # <br /> LOCATION S;zo3 t..) . 'E�us. L�� �oS DATE --2�- 93 <br /> CITY TIME <br /> Well ID. U— 7 Well Condition D k <br /> Well Diameter 3 in. Hydrocarbon Thickness f+ <br /> Total Depth 15ft Volume z" = 0.I7 6- = 1.50 I2' = 5.80 <br /> Factor 3' = 0.38 8" = 2.60 <br /> Depth to Liquid— 5,2ft. (VF) 4" = 0.66 10" = 4.10 <br /> casin l z `75 3 g — �EsP mgeed <br /> x(VF) 1.3 gal. <br /> (volumes/ V olumc <br /> Purging Equipment <br /> Sampling Equipment <br /> ..Starting-Time �-. 5 Purging 'Flow "Rate gpm <br /> /(UFT9!�g) <br /> _ (Anticipated\ <br /> Pu gee gal. Frpm — ( Purging 1 min. <br /> (:,s <br /> olume� \ Time. <br /> Time _ PE Conductivity Temperature Volume <br /> 0-173 <br /> 1 <br /> 7 , 1� <br /> Did well dewater? if yes, time Volume <br /> Sampling Time t 3 U 7 v 'Weather Conditions-7>i L <br /> Analysis r-Nk 91-4E) Bottles Used <br /> Chain of Custody Number <br /> COLoaar7S <br />