lviarcn ia, iyy3 <br /> Page 10 <br /> Implementation Schedule <br /> Upon approval of the recommended strategy by Unocal, PACIFIC will submit a <br /> scope of work and fee estimate to initiate remediation. A remediation schedule is <br /> presented below. <br /> ` Task Completion Date <br /> Remedial strategy approval .04/19/93 <br /> Submit air emissions permit application 05/14/93 <br /> Complete design of remedial system 06/18/93 <br /> ..1 <br /> r Obtain building permits 07/09'/93 <br /> 5s. <br /> _ Prepare bid package .07/16/93 <br /> . Purchase capital equipment 08/13/93 <br /> Construction of remedial system 08/27/93 <br /> 'L System start-up .10/08/93 <br /> A <br /> Implementation will follow this schedule,given unforeseen circumstances do not <br /> hinder the pace of implementation. If problems meeting the proposed schedule <br /> • arise,it will be revised, and the appropriate parties will be contacted. <br /> Ifyou have any questions, please call. <br /> Sincerely, <br /> Pacific Environmental Group, Inc. <br /> Brian Frus <br /> I <br /> Senior Staff Engineer <br /> Gc w-& <br /> i <br /> Lance D. Geselbracht, P.E. <br /> Senior Engineer <br /> RCE 34688 <br /> I <br /> I• A <br /> i. T. <br /> 'II <br /> ;, <br />`77:. r <br /> 3100104JIRAP <br /> M;. <br />