Laserfiche WebLink
Brian T. Frus ' <br /> Pacific Environmental Group, Inc. <br /> Project: 310-01.04 <br /> Date: February 1, 1993 <br /> Calculate Mass Removal Over Time: <br /> .; Cf 1 Cf <br /> M(t) (CQ; flow) • _ 1 - 1] <br /> — (1 - exp(-kA• t) ) + t11 <br /> j 100 kA 100 <br /> Graph the mass removal, Mover time: <br /> 0• day,2• day . .360- day t2 0• day,3 0• day . .360- day <br /> t2 M(t2) t2 . := 1• day <br /> 1000- 1b <br /> da lb M(t2) <br /> 0 0 7.1 <br /> 30 180.451 lb <br /> 60 306.846 <br /> 90 397.577 <br /> 120 464.779 <br /> M(t) 150 516.457 <br /> j 180 557.893 <br /> a : 210 592.573 <br /> 240 622.794 <br /> 270 650.074 <br /> i <br /> 3001 675.414 <br /> 330 699.474 <br /> 0. lb 360 722.689 <br /> 0• day t 36.0- day <br /> f „ <br /> Units and conversions: <br /> gm = 1M day = 1T cm = 1L <br /> I <br /> day i;y, 3 <br /> f m = 1 1000- an cf = 28.32. 1 <br /> 1440 <br /> t, <br /> -6 <br /> ug 10 „gm lb = 453 .6• gm <br />