Laserfiche WebLink
Department of Public Works <br /> ° Kris Balaji,Director of Public Works <br /> SAN J 0 A Q U I N <br /> COUNTY a z• Fritz Buchman,Deputy DirectorlDevelopment <br /> Greatness grov�s here. <br /> Michael Selling,Deputy Director/Engineering <br /> waddeg foe YOU Jim Stone,Deputy DirectorlOperations <br /> Kristi Rhea,Manager of Strategic Initiatives <br /> February 13, 2019 <br /> MEMORANDUM CFwED <br /> TO: Community Development Department E L8 13 2019 <br /> CONTACT PERSON: Christine Luckasen San Joaquin County <br /> FROM: Alex Chetley,Engineering Services Manager Community DevelOp..t <br /> Development Services Division <br /> SUBJECT: PA-1800318;A Site Approval application for a small winery and tasting room on a 16.41 <br /> acre parcel in the AG-40 zone.This project includes three(3)phases.Phase One,to be <br /> completed in twelve(12)months, includes the construction of a 2,800 square foot tasting <br /> room, an 8,000 square foot production facility,two(2)2,000 square foot covered outdoor <br /> seating areas and a 1,500 square foot covered crushing pad.Phase Two,to be completed <br /> in five (5)years, includes the construction of two (2) 6,000 square foot expansions to the <br /> production facility.Phase Three,to be completed in ten(10)years, includes the <br /> construction two(2) 6,000 square foot expansions to the production facility; located on <br /> the south side of Acampo Road and west of Elliott Road,Acampo. <br /> (Supervisorial District 4) <br /> PROPERTY OWNER: Jeremy Trettevik APPLICANT: Same <br /> ADDRESS: 12080 E. Acampo Road,Acampo APN: 017-270-12 <br /> INFORMATION: <br /> The site is currently located within a Federal Emergency Management Agency Designated Flood Hazard <br /> Area designed as zone X&A.E.The 100-Year Flood Elevation will be approximately 75-76 feet NAVD <br /> 1988. <br /> Elliott Road has an existing right-of-way of variable width and a planned right-of-way width of 84 feet. <br /> Acampo Road has an existing right-of-way of variable width and a planned right-of-way width of 60 feet. <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for all work within road right-of-way. (Note: Driveway <br /> encroachment permits are for flatwork only—all vertical features, including but not limited to <br /> fences,walls,private light standards, rocks, landscaping and cobbles are not allowed in the right-of- <br /> way.) (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. Prior to issuance of the occupancy permit,the driveway approach shall be improved in accordance <br /> with the requirements of San Joaquin County Improvement Standards Drawing No. 17 [return radii <br /> for truck-trailer egress shall be designed to prevent encroachment onto opposing lanes of traffic] <br /> (Development Title Section 9-1145.5) <br /> 1810 East Hazelton Avenue I Stockton, California 95205 1 T 209 468 3000 1 F 209 468 2999 <br />